Planning application
St Mungo Parish Church Kettleholm Lockerbie DG11 1BU
Works: Extension Loft or dormer Windows or glazing Domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
INTERNAL AND EXTERNAL ALTERATIONS INCLUDING FORMATION OF NEW DOOR OPENING AND INSTALLATION OF ROOFLIGHTS TO NORTH ELEVATION; ERECTION OF EXTENSION, INSTALLATION OF CONSERVATION STYLE AND SLIDING CONSERVATION STYLE ROOFLIGHTS AND ROOF MOUNTED SOLAR PV PANELS AND FORMATION OF TWO NEW DOOR OPENINGS TO SOUTH ELEVATION AND INSTALLATION OF 8 REPLACEMENT WINDOWS TO BRING ABOUT CHANGE OF USE OF CHURCH TO DWELLINGHOUSE
As published by the council, reference 24/0650/LBC
Application record
- Reference
- 24/0650/LBC
- Type
- Listed Building Consent
- Status
- Decided
- Decision
- Grant Unconditionally
- Received
- 29 Mar 2024
- Validated
- 22 Apr 2024
- Decided
- 23 Aug 2024
- Ward
- Annandale North
- Decision by
- Delegated
- Postcode
- DG11 1BU
Timeline
Dates from the published record
-
29 Mar 2024
Received by Dumfries and Galloway
-
22 Apr 2024
Validated
Checked as complete and ready for consideration.
-
23 Aug 2024
Decision issued: Grant Unconditionally
-
13 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file
2 applications on PlanIndex
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
59 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Dumfries and Galloway granted permission on 23 August 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
St Mungo Parish Church Kettleholm DG11 1BU
CHANGE OF USE FROM CHURCH (CLASS 10) TO DWELLINGHOUSE (CLASS 9) AND ALTERATIONS INCLUDING FORMATION OF NEW DOOR OPENING AND INSTALLATION OF ROOFLIGHTS TO NORTH ELEVATION; ERECTION OF EXTENSION, INSTALLATION OF ROOFLIGHTS AND ROOF MOUNTED SOLAR PV PANELS TO SOUTH ELEVATION; INSTALLATION OF 8 REPLACEMENT WINDOWS; ERECTION OF DETACHED TWO STOREY GARAGE AND STORE AND DETACHED WORKSHOP/STORE; INSTALLATION OF SEWAGE TREATMENT PLANT AND ASSOCIATED WORKS
Granted Full applications Extension Loft or dormer +1 60 docsDomestic
Other heritage and listed building applications
In Dumfries and Galloway
-
26/1550/LBC Awaiting decision
Lockerbie Town Hall High Street Lockerbie DG11 2ES
REPAIR AND REPLACEMENT OF STONEWORK TO WEST ELEVATION OF TOWN HALL
-
26/1537/LBC Awaiting decision
Hetland Hall Hotel Carrutherstown Dumfries DG1 4JX
ALTERATIONS AND ERECTION OF EXTENSIONS TO HOTEL TO FORM ADDITIONAL BEDROOMS, WEDDING CEREMONY ROOM AND SPA FACILITY INCLUDING SWIMMING POOL
-
26/1530/LBC Awaiting decision
136 High Street Dumfries DG1 2BG
ALTERATIONS INCLUDING RE-SLATING OF ROOF, REPLACEMENT TIMBER SARKING, REPAIR AND REPAINTING OF EXISTING TIMBER WINDOWS AND EXTERNAL RENDERED AND STONE FACADES AND REPLACEMENT OF DAMAGED GLAZING
-
26/1074/LBC Granted
Mahaar Schoolhouse Kirkcolm Stranraer DG9 0NZ
ERECTION OF EXTENSION TO SOUTH ELEVATION OF DWELLINGHOUSE
-
26/0816/LBC Granted
Glasserton Church Whithorn Newton Stewart DG8 8LY
ALTERATIONS, EXTENSION AND FORMATION OF ROOF TO BRING ABOUT CHANGE OF USE OF VESTRY TO DWELLINGHOUSE (CLASS 9)