Planning application
Sandy Knowe Wind Farm South-West Of Kirkconnel
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
CONSULTATION FROM SCOTTISH MINISTERS REGARDING AN APPLICATION MADE UNDER SECTION 36C OF THE ELECTRICITY ACT 1989 TO EXTEND THE OPERATIONAL LIFESPAN OF SANDY KNOWE WIND FARM BY VARIANCE FROM CONDITION 1 OF THE SECTION 36 CONSENT AND CONDITION 7 OF THE DEEMED PLANNING PERMISSION (FROM 28 YEARS TO 40 YEARS)
As published by the council, reference 23/1929/S36
Application record
- Reference
- 23/1929/S36
- Type
- Section 36 Consultation
- Status
- Decided
- Decision
- Granted As published: Raise No Objections
- Received
- 5 Sep 2023
- Validated
- 5 Sep 2023
- Decided
- 30 Apr 2024
- Ward
- Mid And Upper Nithsdale
Timeline
Dates from the published record
-
5 Sep 2023
Received by Dumfries and Galloway
-
30 Apr 2024
Decision issued: Raise No Objections
-
20 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Dumfries and Galloway granted permission on 30 April 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Sandy Knowe Wind Farm Kirkconnel Dumfries DG4 6NR
CONSULTATION REGARDING AN APPLICATION MADE UNDER SECTION 36 OF THE ELECTRICITY ACT 1989 FOR EXTENSION TO WIND FARM COMPRISING ERECTION OF 3 WIND TURBINES (MAXIMUM HEIGHT TO TIP 125 METRES), 3 WIND TURBINES (MAXIMUM HEIGHT TO TIP 149.9 METRES), BATTERY STORAGE AND ASSOCIATED INFRASTRUCTURE (ASSOCIATED INFRASTRUCTURE INCLUDES USE OF EXISTING, CONSENTED/UNDER CONSTRUCTION ACCESS TRACKS, NEW ACCESS TRACKS INCLUDING THREE WATERCOURSE CROSSINGS, CONSTRUCTION OF TURBINE FOUNDATIONS AND CRANE HARDSTANDINGS, UNDERGROUND CABLING, USE OF AN EXISTING BORROW PIT AND REUSE OF TWO CONSENTED TEMPORARY STORAGE COMPOUNDS) (REVISED PROPOSAL)
Granted Outline Extension 20 docs
Other outline applications
In Dumfries and Galloway
-
26/1629/UTL Granted
Oswald Crescent Southerness DG2 8BB
INSTALLATION OF 5NO. TELECOMMUNICATIONS POLES
-
26/1624/UTL Awaiting decision
Craigadam House Kirkpatrick Durham Castle Douglas DG7 3HU
PROPOSED 2 SPAN OVERHEAD LINE DIVERSION
-
26/1631/UTL Awaiting decision
Killiewarren Tynron Thornhill DG3 4LD
RE-BUILDING OF 11,000 VOLTAGE WOOD POLE POWERLINE TO THREE PHASE
-
26/1608/UTL Granted
Hazelberry Avenue And B7068 Tundergarth Lockerbie DG11 2PZ
INSTALLATION OF 2NO. TELECOMMUNICATIONS POLES
-
26/1606/UTL Granted
Ruthwell DG1 4NW
INSTALLATION OF 1NO. TELECOMMUNICATIONS POLE