Planning application

P25/0703/C1

COLLEY LANE PRIMARY SCHOOL, COLLEY LANE, CRADLEY, HALESOWEN, DUDLEY, B63 2TN

Granted Dudley Discharge of Condition

Proposal

Discharge of Condition No's. Condition 7 (Tree Protection), Condition 8 (Tree Felling/Pruning Specification), Condition 12 (Construction Environmental Management Plan (CEMP)), and Condition 13 (Landscape and Ecological Management Plan (LEMP))

As published by the council, reference P25/0703/C1

Timeline

Dates from the published record

  1. 23 Jan 2026

    Received by Dudley

  2. 23 Jun 2026

    Decision issued: Approved

  3. 23 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About conditions applications

How this application type works

This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.

More on conditions applications in our guide

Nearby applications

Within 500 metres

  • P26/0593 Awaiting decision

    23, COLLEY LANE, CRADLEY, HALESOWEN, B63 2TN

    Fell 2. Birch trees

    19 May 2026 98m away Trees
  • P24/1059/PNA Granted

    45, SLADE ROAD, CRADLEY, HALESOWEN, B63 2UR

    Prior Notification for the erection of a single storey rear extension with a projection of 4m from rear wall, 0m to eaves and 3m maximum height (following demolition of existing conservatory)

    11 Sep 2024 108m away Prior approval
  • P26/0577 Awaiting decision

    116, COLLEY GATE, CRADLEY, HALESOWEN, B63 2BU

    Display of 1no. Illuminated totem sign

    15 May 2026 160m away Advertising
  • P14/1547 Granted

    THE WIDDERS P H, BARRACK LANE, CRADLEY, HALESOWEN, B63 2UX

    Raised decking area to side of property (Retrospective)

    9 Mar 2015 198m away Full applications
  • P15/0603/PNA Granted

    24, WEST ROAD, CRADLEY, HALESOWEN, B63 2US

    Prior Notification for the erection of a single storey rear extension with a pro

    23 Apr 2015 199m away Prior approval
  • P15/0077 Withdrawn

    18, MAPPS CLOSE, CRADLEY, HALESOWEN, B63 2TG

    Two Storey Side Extension

    21 Jan 2015 215m away Full applications

In Dudley

  • P24/1043/C1 Withdrawn

    LAND ADJ TO 16, DENBIGH CLOSE, DUDLEY, DY1 2RJ

    Discharge of Biodiversity Net Gain Statutory Condition pursuant to planning permission No. P24/1043

    20 Nov 2025 Conditions
  • P22/0419/C1 Decided

    Land North of Bradley Road, Stourbridge, DY8 1UX

    Discharge of Conditions 10 (Soft Landscaping), 11 (BT), 12 (Hard Surfacing), 13 (Materials), 14 (Levels), 15 (Ecology), 16 (Access), 17 (EVCP), 18 (Cycle Storage), 19 (Bin Stores), 23 (Surface Water Drainage), 25 (Noise Mitigation), 28 (Construction Method Statement) and 29 (Renewables).

    12 Aug 2025 Conditions
  • P24/0891/C3 Granted

    63, Old Chain Yard, CASTLE STREET, COSELEY, BILSTON, WV14 9DW

    Discharge of Condition 14 (materials), 15 (boundary treatment) and 22 (hard surfacing materials)

    8 Apr 2026 Conditions
  • P25/0616/C1 Granted

    13, CIDER AVENUE, QUARRY BANK, BRIERLEY HILL, DY5 2XR

    Discharge of Condition 4 – Boiler Compliance Condition

    14 May 2026 Conditions
  • P25/0958/C1 Awaiting decision

    Land North of Bradley Road, Stourbridge, DY8 1UX

    Discharge of Conditions 10 (Soft Landscaping), 11 (Boundary Treatment), 12 (Hard Surfacing), 13 (Materials), 14 (Levels), 15 (Ecology), 16 (Access), 17 (Cycle Storage), 18 (Bin Stores), 22 (Sustainable Drainage), 24 (Noise Mitigation), 27 (Construction Method Statement), 28 (Renewables), 30 (Drainage) and 32 (CEMP).

    21 Jul 2026 Conditions