Skip to content
PlanIndex Get alerts
Menu

Planning application

P24/0562/C1

278, STOURBRIDGE ROAD, DUDLEY, DY1 2EE

Decided Dudley Discharge of Condition

Proposal

Discharge of Conditions 5 (CEMP), 6 (LEMP), 7 (HMMP), 8 (Soft Landscaping), 9 (Tree Protection Plan), 10 (Tree work specification), 12 (Foul and surface water drainage), 13 (Access turning and parking) & 20 (Renewable energy)

As published by the council, reference P24/0562/C1

Timeline

Dates from the published record

  1. 13 Oct 2025

    Received by Dudley

  2. 23 Jul 2026

    Added to PlanIndex

After the decision

The process from here

The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.

If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.

About conditions applications

How this application type works

This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.

More on conditions applications in our guide

Nearby applications

Within 500 metres

  • P22/1780 Refused

    VACANT LAND (FORMER HENRY BOOT TRAINING LTD), 280, STOURBRIDGE ROAD, DUDLEY

    Outline planning permission for up to 39 apartments with associated infrastructure (all matters reserved except access) and widening of existing access from Stourbridge Road

    12 Dec 2022 37m away Outline
  • P14/1750 Granted

    Land Adj., 1, Holly Street, Brierley Hill, Dudley, DY1 2EJ

    Erection of 2 no. dwellings and associated parking to the rear of 254 Stourbridg

    9 Dec 2014 78m away Full applications
  • P14/1498 Granted

    THE WOODSIDE LIBERAL CLUB, 278, STOURBRIDGE ROAD, DUDLEY, DY1 2EE

    Outline application for demolition of existing building and erection of 11 no. r

    10 Oct 2014 116m away Outline
  • P25/1173 Granted

    FORGE HOUSE, STOURBRIDGE ROAD, BRIERLEY HILL, DY5 1LB

    Erection of 1.8m high iron railing boundary fence

    26 Sep 2025 368m away Full applications
  • P24/0793 Withdrawn

    Land adjacent to 33 Cochrane Road, Dudley

    Outline application for residential development (all matters reserved)

    11 Jul 2024 373m away Full applications
  • P26/0383 Awaiting decision

    Land adj to 33, Cochrane Road, Dudley, DY2 0SF

    Outline Applications for the erection of up to 4 no. dwellings with associated parking and landscaping. (All matters reserved)

    1 Apr 2026 373m away Outline

In Dudley

  • P24/1043/C1 Withdrawn

    LAND ADJ TO 16, DENBIGH CLOSE, DUDLEY, DY1 2RJ

    Discharge of Biodiversity Net Gain Statutory Condition pursuant to planning permission No. P24/1043

    20 Nov 2025 Conditions
  • P22/0419/C1 Decided

    Land North of Bradley Road, Stourbridge, DY8 1UX

    Discharge of Conditions 10 (Soft Landscaping), 11 (BT), 12 (Hard Surfacing), 13 (Materials), 14 (Levels), 15 (Ecology), 16 (Access), 17 (EVCP), 18 (Cycle Storage), 19 (Bin Stores), 23 (Surface Water Drainage), 25 (Noise Mitigation), 28 (Construction Method Statement) and 29 (Renewables).

    12 Aug 2025 Conditions
  • P24/0891/C3 Granted

    63, Old Chain Yard, CASTLE STREET, COSELEY, BILSTON, WV14 9DW

    Discharge of Condition 14 (materials), 15 (boundary treatment) and 22 (hard surfacing materials)

    8 Apr 2026 Conditions
  • P25/0616/C1 Granted

    13, CIDER AVENUE, QUARRY BANK, BRIERLEY HILL, DY5 2XR

    Discharge of Condition 4 – Boiler Compliance Condition

    14 May 2026 Conditions
  • P25/0958/C1 Awaiting decision

    Land North of Bradley Road, Stourbridge, DY8 1UX

    Discharge of Conditions 10 (Soft Landscaping), 11 (Boundary Treatment), 12 (Hard Surfacing), 13 (Materials), 14 (Levels), 15 (Ecology), 16 (Access), 17 (Cycle Storage), 18 (Bin Stores), 22 (Sustainable Drainage), 24 (Noise Mitigation), 27 (Construction Method Statement), 28 (Renewables), 30 (Drainage) and 32 (CEMP).

    21 Jul 2026 Conditions