Planning application

26/00023

Broad Oak Canterbury

Granted Dover External Consultations

Proposal

CA/25/02340 - EIA Scoping opinion request for creation of water storage reservoir with a storage capacity that would be approximately 5,126 million litres and a surface area of approximately 70 hectares, engineering operations including erection of up to 17m high embankments, creation of raw water abstraction points and pipelines, erection of common high lift transfer pumping station, installation of potable water pipeline running approximately 7.5km west connecting the reservoir water treatment works (WTW) with the existing Blean Service Reservoir, and associated non-water infrastructure elements such as bypass channel of the Sarre Penn and a fish pass, site access and interal access roads, visitor amenities hub, car parking, open spaces, wetland storage area, improvements to footpath, cycleway and bridleway networks, landscape and biodiversity habitat proposals, such as woodland, scrub, hedgerows, grassland, wetland and other habitat features, utility diversion and diversion of minor roads and footpaths within the footprint of the reservoir.

As published by the council, reference 26/00023

Timeline

Dates from the published record

  1. 7 Jan 2026

    Received by Dover

  2. 8 Jan 2026

    Validated

    Checked as complete and ready for consideration.

  3. 5 Feb 2026

    Decision issued: Raise No Objection

  4. 26 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About this record

Reading the register

This page mirrors an entry on the statutory planning register that Dover is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.

Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.