Planning application
P/VOC/2026/01965
Dundas Bay & Deanesly Point Silverlake Warmwell Road Crossways
Proposal
Erection of holiday homes within villages named Dundas Bay & Deanesly Point, along with associated boat stores, bin stores, ancillary buildings, community buildings, communal areas, landscape, infrastructure together with other operations including access roads. To vary conditions 1 and 3 of planning permission P/VOC/2025/06322 to amend the layout - Unit changes on Deanesly Point plots 04 and 05, Dundas Bay 01-18 and associated landscape; removal of boat stores to west of Dundas Bay plot 01 and additional stores to south of Dundas Bay plot 11; boundary amendments to Deanesly Point plots 03 – 06; specific landscape amendments to Deanesly Point 50 and to the south of Deanesly Point Plots 2 and 3; relocated parking for Dundas Bay 20 and 21; unit design amendments to Deanesly Point plot 43, 45, 49 and 52; layout arrangement to the back-of-house area to the south-east of Deanesly Point; relocation and inclusion of new footpaths; removal of the reedbeds; parking amendment opposite Deanesly Point plot 48
As published by the council, reference P/VOC/2026/01965
Timeline
Dates from the published record
-
8 Apr 2026
Received by Dorset
-
31 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Dorset for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About amendments applications
How this application type works
An amendment application changes a permission that already exists. Non-material amendments cover small adjustments with no wider effect, while minor material amendments, usually made by varying a condition, allow modest design changes without a fresh application. Anything beyond that needs a new permission, so the scope here is deliberately narrow.
Nearby applications
Within 500 metres
-
P/MPO/2025/05206 Granted
Silverlake Warmwell Road Crossways Dorchester DT2 8BT
Modification of S106 dated 11 November 2014 pursuant to Planning Application 1/D/13/001112 for written approval of location, layout, accessibility, management & maintenance of Part H Silverlake heritage trail and archaeology interpretation facility
Other amendments applications
In Dorset
-
P/NMA/2026/03502 Refused
Former Perryfield Works Complex Pennsylvania Road Portland DT5 1FJ
Non-material amendment to Approved P/A P/18/00883/FUL (Erect four dwellings) to re-position the existing garages and parking bays
-
P/VOC/2026/04014 Awaiting decision
2 Bonvils Road Worth Matravers BH19 3LR
Erect ground floor extensions and replacement of existing shed to create garden room (with variation of Condition 2 of permission P/HOU/2026/00371 to reduce the scale of the proposal)
-
P/NMA/2026/03363 Granted
Allendale House Hanham Road Wimborne Minster BH21 1AS
Non material amendment to planning permission P/FUL/2025/01489 to revise proposed bollards to the same with LED capping for increased visibility and reinstatement of extra section of walling.
-
P/VOC/2026/02989 Granted
22 Kingston Close Blandford Forum DT11 7UQ
Erect first floor rear extension (With Variation of condition 2 of planning permission P/HOU/2025/01109 to amend approved plans).
-
P/VOC/2026/04024 Awaiting decision
Bulbury Golf Course Bulbury Lane Lytchett Minster BH16 6HR
Erect driving range building and netting( with variation to conditions 2,4 & 6 of planning permission P/FUL/2022/04851 to revise the design for the driving range facility that substantially reduces the overall footprint and massing of the facility. The amendment seeks to reduce the scale of the built structure to eight covered bays, with ball containment instead achieved through a fully netted enclosure surrounding the hitting area, incorporating synthetic turf and net support structures at each corner, and an ancillary ball dispensing unit and a robot holding area with associated hopper.