Skip to content
PlanIndex Get alerts
Menu

Planning application

P/PALH/2025/05895

7 Cedar Way Ferndown BH22 9UE

Granted Dorset Prior Approval - Larger Home Extension

Proposal

Erect single storey rear extension; To extend 5.50 metres beyond the rear wall of the original dwelling house: maximum height 3.28 metres : height to eaves 2.10 metres

As published by the council, reference P/PALH/2025/05895

Timeline

Dates from the published record

  1. 8 Oct 2025

    Received by Dorset

  2. 6 Nov 2025

    Decision issued: Prior Approval Not Required

  3. 26 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About prior approval applications

How this application type works

Prior approval applications arise where permitted development rights already grant the principle of the work, such as larger home extensions, changes of use to housing or agricultural buildings. The council may only consider the specific matters set out in the rules, for example transport, flooding or appearance, and in many classes the work may proceed if the council does not respond within the deadline, commonly 56 days.

More on prior approval applications in our guide

Nearby applications

Within 500 metres

  • 8 Cedar Way Ferndown BH22 9UF

    Dead Scots pine - Fell.

    19 Nov 2024 105m away Trees
  • P/TRT/2025/05582 Split decision

    6 Maple Drive Ferndown BH22 9ST

    T1 Pine: Remove x 2 low branches touching the neighbours' fence and shed. OR Fell.

    19 Sep 2025 191m away Trees
  • P/FUL/2026/04025 Awaiting decision

    128 Ameysford Road Ferndown BH22 9QE

    Change of use from a family annexe to an annexe for short term holiday let.

    24 Jul 2026 254m away Full applications
  • 2 Leeson Drive Ferndown BH22 9QQ

    Oak x 2 trunks: Fell and replant.

    9 Sep 2025 263m away Trees
  • P/TRT/2024/05993 Split decision

    56 Pinewood Road Ferndown BH22 9RR and adjacent strip of land

    T1 Scots Pine (located 56 Pinewood Road): Fell to ground level. Replant within 3m of existing tree with a Scots Pine 1.5-2m nursery grown stock. T2 English Oak (located on adjacent strip of land: Reduce the low lateral growth growing in a northerly direction towards the rear garden of No. 56 by no more than 1.75m from the tips inwards. Ensuring that all cuts are brought back to viable growth points and that no pruning wounds exceed 50mm in diameter.

    25 Oct 2024 268m away Trees
  • 20 Pine Glen Avenue Ferndown BH22 9QP

    Erect a single storey rear extension and garage side extension

    18 May 2026 313m away Householder

In Dorset

  • P/PAAC/2026/04100 Awaiting decision

    Himmon Copse Farm Knoll Lane Corfe Mullen BH21 3RF

    Conversion of an existing agricultural building to residential

    28 Jul 2026 Prior approval
  • 181 Hillfield House Dorchester Road Weymouth DT4 7LF

    Conversion of first floor office into first floor flat

    5 Jun 2026 Prior approval
  • P/PABA/2026/04063 Awaiting decision

    Pleydells Farm Higher Street Okeford Fitzpaine DT11 0RQ

    Erect agricultural building.

    27 Jul 2026 Prior approval
  • 523 & 525 Offices Ringwood Road Ferndown BH22 9AQ

    To convert the rear of and upper floors from use Class E into 5 dwellings across both 523 and 525 Ringwood Road.

    3 Jun 2026 Prior approval
  • Forestry Commission Compound Horton Road Ashley Heath BH24 2EJ

    Demolition of existing buildings and replace with a new consolidated forestry operational building incorporating administrative and welfare spaces with associated secure vehicular storage, workshop and covered open storage provision.

    29 Jun 2026 Prior approval