Planning application
Lower Lewell Farm From West Stafford Bypass Through Lewell Lewell DT2 8AP
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
To drill under the riverbed of the River Frome via HD drilling method and a minimum depth of 2 metres and both entry and exit pits will be minimum 8 metres away from the riverbanks and therefore not within the SSSI site. We are applying a Permit for Works via the Environment Agency owing the River Frome itself being the SSSI site. A 32mm green ducting with armoured fibre optic cabling inside being part our full fibre broadband service network.
As published by the council, reference P/PAEL/2025/06802
Application record
- Reference
- P/PAEL/2025/06802
- Type
- Prior Approval - Electronic Communication Network
- Status
- Application Approved
- Decision
- Granted As published: Prior Approval Granted
- Received
- 13 Nov 2025
- Validated
- 13 Nov 2025
- Decided
- 22 Dec 2025
- Ward
- Puddletown and Lower Winterborne Ward
- Parish
- West Knighton
- Decision by
- Delegated
- Postcode
- DT2 8AP
Timeline
Dates from the published record
-
13 Nov 2025
Received by Dorset
-
22 Dec 2025
Decision issued: Prior Approval Granted
-
26 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
15 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Dorset granted permission on 22 December 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About prior approval applications
Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.
Other prior approval applications
In Dorset
-
P/PAED/2026/05480 Awaiting decision
Westbrook Holt Wood Holt BH21 7DR
Erection of additional storey
-
P/PAAC/2026/04362 Refused
Lower Butterwick Farm Boys Hill Holnest DT9 5PJ
Change of use & conversion of agricultural building into 1 No. dwelling (Class C3).
-
P/PAMF/2026/04357 Granted
Flat 1 Swan Yard Cheap Street Sherborne DT9 3AX
Change of use from Commercial to Dwelling House
-
P/PABA/2026/05446 Awaiting decision
Kingston Barm Farmhouse Langton Road Kingston BH20 5LR
Erect agricultural building
-
P/PALH/2026/05445 Awaiting decision
Little Lions Farm Horton Road Ashley Heath BH24 2EU
Erect 2 single storey rear extensions to measure 7.99m in length, with a maximum height of 2.80m and a height to eaves of 2.80m