Skip to content
PlanIndex Get alerts
Menu

Planning application

P/PAEL/2023/00786

Telecommunications Mast Site 4177 Easton Street Portland

Granted Dorset Prior Approval - Electronic Communication Network

Proposal

Removal of existing 15m monopole and associated antennas. Installation of a replacement 20m high monopole with 3 No. antennas, 18 No. Remote Radio Units (RRU’s) and 2 No. transmission dishes. Installation of 2 No. equipment cabinets and ancillary development thereto

As published by the council, reference P/PAEL/2023/00786

Timeline

Dates from the published record

  1. 10 Feb 2023

    Received by Dorset

  2. 14 Mar 2023

    Decision issued: Prior Approval Not Required

  3. 31 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About prior approval applications

How this application type works

Prior approval applications arise where permitted development rights already grant the principle of the work, such as larger home extensions, changes of use to housing or agricultural buildings. The council may only consider the specific matters set out in the rules, for example transport, flooding or appearance, and in many classes the work may proceed if the council does not respond within the deadline, commonly 56 days.

More on prior approval applications in our guide

Nearby applications

Within 500 metres

  • Two Chimneys Grove Road Portland DT5 1DS

    T1 Silver Birch - Crown reduction by 3m overall

    21 Oct 2024 124m away Trees
  • 2 Reforne Close Portland DT5 2AS

    T1 Sycamore - Fell

    13 Oct 2025 178m away Trees
  • P/HOU/2026/02514 Awaiting decision

    58 Reforne Portland DT5 2AN

    Demolition of the existing outrigger and erection of a single-storey rear extension.

    12 Jun 2026 215m away Householder
  • Stanley House 28 Easton Street Portland DT5 1BT

    Replace 2 timber casement windows with new timber casement windows

    29 Aug 2025 237m away Heritage and listed buildings
  • P/FUL/2026/02519 Awaiting decision

    8-10 Reforne Portland DT5 2AL

    Change of use from two shops to one residential unit on the ground floor to include alterations to the frontage of the property and rear extension. Erection of 2 sheds in rear garden

    26 May 2026 245m away Full applications
  • P/VOC/2025/06860 Withdrawn

    8-10 Reforne Portland DT5 2AL

    Change of use from 2 shops to 1 residential unit (with variation of conditions 2 & 3 of planning permission P/PACD/2025/01798 to change drawing numbers and provide window details)

    26 Nov 2025 245m away Amendments

In Dorset

  • P/PAAC/2026/04100 Awaiting decision

    Himmon Copse Farm Knoll Lane Corfe Mullen BH21 3RF

    Conversion of an existing agricultural building to residential

    28 Jul 2026 Prior approval
  • 181 Hillfield House Dorchester Road Weymouth DT4 7LF

    Conversion of first floor office into first floor flat

    5 Jun 2026 Prior approval
  • P/PABA/2026/04063 Awaiting decision

    Pleydells Farm Higher Street Okeford Fitzpaine DT11 0RQ

    Erect agricultural building.

    27 Jul 2026 Prior approval
  • 523 & 525 Offices Ringwood Road Ferndown BH22 9AQ

    To convert the rear of and upper floors from use Class E into 5 dwellings across both 523 and 525 Ringwood Road.

    3 Jun 2026 Prior approval
  • Forestry Commission Compound Horton Road Ashley Heath BH24 2EJ

    Demolition of existing buildings and replace with a new consolidated forestry operational building incorporating administrative and welfare spaces with associated secure vehicular storage, workshop and covered open storage provision.

    29 Jun 2026 Prior approval