Skip to content
PlanIndex Get alerts
Menu

Planning application

60 Lonnen Road Colehill BH21 7AX

Granted Dorset P/HOU/2025/05431 Householder Planning Permission

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erect single storey side extension

As published by the council, reference P/HOU/2025/05431

Application record

Reference
P/HOU/2025/05431
Type
Householder Planning Permission
Status
Application Approved
Decision
Granted
Received
17 Sep 2025
Validated
17 Sep 2025
Decided
29 Oct 2025
Ward
Colehill and Wimborne Minster East Ward
Parish
Colehill
Decision by
Delegated
Postcode
BH21 7AX

Timeline

Dates from the published record

  1. 17 Sep 2025

    Received by Dorset

  2. 29 Oct 2025

    Decision issued: Granted

  3. 26 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Dorset granted permission on 29 October 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About householder applications

Householder applications cover work to an existing house and its garden, such as extensions, lofts and outbuildings, and cannot create a separate dwelling or change what the building is used for. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 58 Lonnen Road Colehill BH21 7AX

    P/VOC/2024/03052 Submitted 6 Jun 2024 50 yards away

    Application to Vary Conditions 2 of Approved P/A P/FUL/2022/05316 (Demolish existing house and erect two detached dwellings (revised scheme) to minor change to the height and design of house 2 (at the rear of the site) - increase height of dwelling and removal of raised light well, reduction in the width of the access drive to the rear of the site for house 2 (as approved by P/VOC/2024/00929), replacement of detached bicycle store with garage (as approved by P/VOC/2023/02970 and P/VOC/2024/00929), removal of green roof (as approved by P/VOC/2024/00929)

    Granted Amendments Demolition 30 docs
    Domestic
  • 58 Lonnen Road Colehill BH21 7AX

    P/NMA/2026/00198 Submitted 14 Jan 2026 50 yards away

    NMA Application: Removal of approved carport structure serving house 2 and confirmation of Vandersanden “Antro” brick in the external alteration of house 2, all approved under application no. P/VOC/2025/02583 - Demolish existing house and erect two detached dwellings (revised scheme) (with variation of condition 2 of permission P/VOC/2024/03052 to change the height and design of house 2 (at the rear of the site) - Reduce the footprint of house 2 with minor internal and external alterations along with the replacement of the garage with a car port.

    Withdrawn Amendments Demolition 10 docs
  • 58 Lonnen Road Colehill Wimborne BH21 7AX

    P/FUL/2023/01568 Submitted 23 Mar 2023 50 yards away

    Demolition of existing house and erection of three detached dwellings

    Refused Full applications Demolition 51 docs
  • Cornels Haslop Road Colehill BH21 2SG

    P/TRT/2023/02129 Submitted 13 Apr 2023 100 yards away

    T1 Oak: Remove lowest primary limb to create a 5m clearance over the driveway of Marianne Lodge; Prune back the remaining lateral spread over the driveway by reducing small diameter (up to 50mm) secondary and tertiary branches by 2m back to suitable growth points. T2 Oak: Prune back the lateral spread by small diameter (up to 50mm) secondary and tertiary branches by 2m back to suitable growth points over the driveway of Marianne Lodge. T3 Oak: Prune back the lateral spread small diameter (up to 50mm) secondary and tertiary branches by 2m back to suitable growth points over the driveway of Marianne Lodge. T4 Oak: Prune back the lateral spread small diameter (up to 50mm) secondary and tertiary branches by 1.5m back to suitable growth points over the driveway of Marianne Lodge.

    Granted Trees 4 docs
  • Cornels Haslop Road Colehill Wimborne BH21 2SG

    P/TRT/2026/02930 Submitted 5 Jun 2026 100 yards away

    T1 English Oak - Prune on the side of Tapiola, Marianne Road only - Prune all over-extending limbs which are forming the secondary canopy of T1 by approximately 2-3m in length (lateral branches only) to approximately the first canopy (as shown in annotated photograph). All branches will be pruned back to growth points. T2 Scots Pine - Crown raise the lower canopy overhanging Tapiola to where there is an obvious crown break (as shown in annotated photograph). All branches will be pruned back to the branch bark collar/ridge on the Scots Pine.

    Granted Trees 6 docs
  • Lythwood Haslop Road Colehill BH21 2SG

    P/TRT/2024/06485 Submitted 6 Nov 2024 150 yards away

    T1 Oak: Fell. Replant with Copper Beech.

    Split decision Trees 7 docs

In Dorset

  • P/HOU/2026/04316 Withdrawn

    Mulberry Cottage Main Road Osmington DT3 6EH

    Alteration of fence to create new driveway and vehicular access

    Received 20 Aug, published by the council 22 Aug 2026 Householder
  • P/HOU/2026/04822 Awaiting decision

    12 Shepherds Way West Lulworth BH20 5SL

    Replace existing balcony

    Received 7 Oct, published by the council 8 Oct 2026 Householder
  • P/HOU/2026/05578 Awaiting decision

    59 Coombe Valley Road Weymouth DT3 6NL

    Conversion of loft space; installation of solar panels and skylight to roof; replacement of windows and doors; replacement of existing weatherboarding to front of property with Cedral boards; installation of glazed guarding to terrace over garage

    Received 7 Oct, published by the council 8 Oct 2026 Householder
  • P/HOU/2026/05316 Awaiting decision

    16 Fortuneswell Portland DT5 1LP

    Removal of existing flat roof dormer windows to front and rear elevations and replace with enlarged flat roof dormer windows. Remove existing asbestos cement tiles and replace with natural slate

    Received 7 Oct, published by the council 8 Oct 2026 Householder
  • Purbeck Lodge Plaisters Lane Weymouth DT3 6LQ

    2-storey side & rear extension over existing garage. Rear single storey flat roof extension with balcony over. Erect single storey double garage

    Received 13 Aug, published by the council 15 Aug 2026 Householder