Skip to content
PlanIndex Get alerts
Menu

Planning application

P/FUL/2026/02993

Land and Buildings known as Tumbledown Farm Radipole Lane Westham Weymouth DT4 9RU

Awaiting decision Dorset Full Planning Application

Proposal

Construction of two polytunnels (re-located from previously-approved position) and installation of solar panels on a free-standing array

As published by the council, reference P/FUL/2026/02993

Timeline

Dates from the published record

  1. 11 Jun 2026

    Received by Dorset

  2. 31 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Dorset for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Rappele Lodge Radipole Lane Westham Weymouth DT4 9RN

    Cypress (T1) - Fell

    31 Oct 2025 212m away Trees
  • P/TRC/2026/03544 Awaiting decision

    Rappele House Radipole Lane Westham Weymouth DT4 9RN

    T1 Bay - Remove to ground level T2 Magnolia - Reduce overall by up to 2m

    29 Jun 2026 218m away Trees
  • P/HOU/2026/01803 Awaiting decision

    24 Grafton Avenue Weymouth DT4 9RZ

    Proposed dormers with Juliet balcony added to existing loft conversion

    30 Mar 2026 312m away Householder
  • Meadow View Causeway Weymouth DT4 9RY

    T1 Ash - Remove Under Regulation 14 (S198)

    6 Oct 2025 359m away Trees
  • 85 Radipole Lane Westham Weymouth DT4 9RS

    Erect rear extension: To extend 4 metres beyond the rear wall of the original dwellinghouse: maximum height 4 metres: height to eaves 3 metres

    10 Sep 2025 368m away Prior approval
  • Old Manor House Radipole Lane Westham Weymouth DT3 5HS

    Remove existing floors and install permeable insulation and limecrete screen. Floor to be tiled over with breathable traditional stone tiles.

    6 Oct 2025 419m away Heritage and listed buildings

In Dorset

  • Steepleton Manor Residential Home B3159 Junction A35T To Rew Manor Winterbourne Steepleton DT2 9LG

    Proposed change of use including alterations to form 14 residential flats with ancillary accommodation and communal facilities, new bin store, car parking and access

    7 May 2025 Full applications
  • The Barn Shepherds Hill Buckhorn Weston SP8 5HX

    Erection of 1no. dwelling

    22 Sep 2025 Full applications
  • Land off Netherhay Lane Drimpton Beaminster DT8 3FS

    Erect steel framed agricultural store 12.2m span x 23m long (5 No. 4.572m bays) x 4m to eaves to have a functional area for the storage of hay harvested from the surrounding field and dry storage for agricultural accessories

    27 Apr 2026 Full applications
  • The Loft Loxley House Great Down Lane Marnhull Sturminster Newton DT10 1JY

    Change of use of studio over carport to short term let

    3 Jun 2026 Full applications
  • P/FUL/2026/02840 Awaiting decision

    Land north of Avenue 50 Winfrith Nuclear Research Site Winfrith Newburgh Dorchester DT2 8WQ

    Land remediation works involving the excavation of a section of pipeline and refilling/reprofiling of the land together with associated temporary soil storage area and contractors’ compound.

    28 Jul 2026 Full applications