Planning application
P/FUL/2026/02936
Eastbury Hotel Long Street Sherborne DT9 3BY
Proposal
Erect single storey side extension. Alterations to façade to create new shopfront.
As published by the council, reference P/FUL/2026/02936
Timeline
Dates from the published record
-
3 Jun 2026
Received by Dorset
-
31 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Dorset for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
P/LBC/2026/02935 Awaiting decision
Eastbury Hotel Long Street Sherborne DT9 3BY
Erect single storey extension and carry out external and internal alterations and formation of bakery, including demolition of existing lean-to. Alterations to façade to create new shopfront.
-
P/LBC/2025/07578 Granted
Flat 3 Brecon House Long Street Sherborne DT9 3BY
Install replacement boiler and flue.
-
P/LBC/2023/00758 Granted
Flat 1, Brecon House Long Street Sherborne Dorset DT9 3BY
to remove existing boiler and install new, requiring an alteration to the flue installation.
-
P/CLP/2025/05796 Granted
Bute House Long Street Sherborne DT9 3BY
Certificate of Lawfulness for the use of 1, 2 & 3 Bute House as a single dwellinghouse
-
P/FUL/2024/05153 Granted
Sherborne Business Centre East Mill Lane Sherborne DT9 3DP
Change of use of building from commercial storage unit to day nursery (use class E(f)).
-
P/TRC/2025/07139 Decided
7 St Swithins Close Sherborne DT9 3DW
T1 Tulip - Prune back approximately 1.5m to previous cut points
Other full applications applications
In Dorset
-
P/FUL/2025/01842 Granted
Steepleton Manor Residential Home B3159 Junction A35T To Rew Manor Winterbourne Steepleton DT2 9LG
Proposed change of use including alterations to form 14 residential flats with ancillary accommodation and communal facilities, new bin store, car parking and access
-
P/FUL/2025/05287 Granted
The Barn Shepherds Hill Buckhorn Weston SP8 5HX
Erection of 1no. dwelling
-
P/FUL/2026/02163 Refused
Land off Netherhay Lane Drimpton Beaminster DT8 3FS
Erect steel framed agricultural store 12.2m span x 23m long (5 No. 4.572m bays) x 4m to eaves to have a functional area for the storage of hay harvested from the surrounding field and dry storage for agricultural accessories
-
P/FUL/2026/03007 Granted
The Loft Loxley House Great Down Lane Marnhull Sturminster Newton DT10 1JY
Change of use of studio over carport to short term let
-
P/FUL/2026/02840 Awaiting decision
Land north of Avenue 50 Winfrith Nuclear Research Site Winfrith Newburgh Dorchester DT2 8WQ
Land remediation works involving the excavation of a section of pipeline and refilling/reprofiling of the land together with associated temporary soil storage area and contractors’ compound.