Skip to content
PlanIndex Get alerts
Menu

Planning application

P/FUL/2026/02936

Eastbury Hotel Long Street Sherborne DT9 3BY

Awaiting decision Dorset Full Planning Application

Proposal

Erect single storey side extension. Alterations to façade to create new shopfront.

As published by the council, reference P/FUL/2026/02936

Timeline

Dates from the published record

  1. 3 Jun 2026

    Received by Dorset

  2. 31 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Dorset for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • P/LBC/2026/02935 Awaiting decision

    Eastbury Hotel Long Street Sherborne DT9 3BY

    Erect single storey extension and carry out external and internal alterations and formation of bakery, including demolition of existing lean-to. Alterations to façade to create new shopfront.

    3 Jun 2026 0m away Heritage and listed buildings
  • Flat 3 Brecon House Long Street Sherborne DT9 3BY

    Install replacement boiler and flue.

    22 Dec 2025 72m away Heritage and listed buildings
  • Flat 1, Brecon House Long Street Sherborne Dorset DT9 3BY

    to remove existing boiler and install new, requiring an alteration to the flue installation.

    8 Feb 2023 77m away Heritage and listed buildings
  • Bute House Long Street Sherborne DT9 3BY

    Certificate of Lawfulness for the use of 1, 2 & 3 Bute House as a single dwellinghouse

    30 Sep 2025 85m away Lawful development
  • Sherborne Business Centre East Mill Lane Sherborne DT9 3DP

    Change of use of building from commercial storage unit to day nursery (use class E(f)).

    9 Sep 2024 128m away Full applications
  • 7 St Swithins Close Sherborne DT9 3DW

    T1 Tulip - Prune back approximately 1.5m to previous cut points

    1 Dec 2025 130m away Trees

In Dorset

  • Steepleton Manor Residential Home B3159 Junction A35T To Rew Manor Winterbourne Steepleton DT2 9LG

    Proposed change of use including alterations to form 14 residential flats with ancillary accommodation and communal facilities, new bin store, car parking and access

    7 May 2025 Full applications
  • The Barn Shepherds Hill Buckhorn Weston SP8 5HX

    Erection of 1no. dwelling

    22 Sep 2025 Full applications
  • Land off Netherhay Lane Drimpton Beaminster DT8 3FS

    Erect steel framed agricultural store 12.2m span x 23m long (5 No. 4.572m bays) x 4m to eaves to have a functional area for the storage of hay harvested from the surrounding field and dry storage for agricultural accessories

    27 Apr 2026 Full applications
  • The Loft Loxley House Great Down Lane Marnhull Sturminster Newton DT10 1JY

    Change of use of studio over carport to short term let

    3 Jun 2026 Full applications
  • P/FUL/2026/02840 Awaiting decision

    Land north of Avenue 50 Winfrith Nuclear Research Site Winfrith Newburgh Dorchester DT2 8WQ

    Land remediation works involving the excavation of a section of pipeline and refilling/reprofiling of the land together with associated temporary soil storage area and contractors’ compound.

    28 Jul 2026 Full applications