Planning application
P/FUL/2025/06557
Cadet Centre Atc Blind Lane Wimborne Minster BH21 1ND
Proposal
Demolition of the existing building and Construction of detached building to create office space. Double storey element interlinked to single storey building with associated Bin Store. Form new vehicular access and sliding gates. Addition of Solar PV & Air Source Heat Pump
As published by the council, reference P/FUL/2025/06557
Timeline
Dates from the published record
-
5 Nov 2025
Received by Dorset
-
2 Apr 2026
Decision issued: Granted
-
26 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
P/HOU/2025/06171 Granted
3 Blind Lane Wimborne Minster BH21 1NJ
Erect single storey rear extension, replacement roof to existing extension, and timber-framed front porch and relocate front door. Install solar panels.
-
P/LBC/2026/03247 Awaiting decision
46 Blind Lane Wimborne Minster BH21 1ND
Replace 6 x windows : 4 x Front wooden sash windows with Slimline Wood Heritage Double Glazed Sash Windows. And replace 1 x rear Casement window like for like plus 1 x Sash window to side elevation. All Windows will be painted to match current colours.
-
P/LBC/2025/07219 Granted
116 West Borough Wimborne Minster BH21 1NH
(i) Replacement of existing internal ‘linings’ to the living and dining rooms (ii) Installation of vents to allow for air circulation through voids in walls (iii) Removal of cement render to chimney breast and repointing of brickwork (iv) Amend existing approval for garden wall detail to include the provision of a creased tile detail below a soldier course (v) The addition of a woodburner with lining and new clay pot and cowl to the living room
-
P/TRD/2025/05024 Granted
Beaucroft Foundation School School Lane Wimborne Minster BH21 1HQ
Tree 2 Small Leafed Lime (dead) - Fell.
-
P/TRC/2025/05600 Granted
45 West Borough Wimborne Minster BH21 1LT
Rear of property. T1 Pear: Reduce by half and prune side growth. T2 Magnolia: Reduce crown by 1/2 meters back to appropriate growth points.
-
P/CLP/2023/00547 Granted
14 Redcotts Lane Wimborne Minster BH21 1JX
Erect single storey rear extension
Other full applications applications
In Dorset
-
P/FUL/2025/01842 Granted
Steepleton Manor Residential Home B3159 Junction A35T To Rew Manor Winterbourne Steepleton DT2 9LG
Proposed change of use including alterations to form 14 residential flats with ancillary accommodation and communal facilities, new bin store, car parking and access
-
P/FUL/2025/05287 Granted
The Barn Shepherds Hill Buckhorn Weston SP8 5HX
Erection of 1no. dwelling
-
P/FUL/2026/02163 Refused
Land off Netherhay Lane Drimpton Beaminster DT8 3FS
Erect steel framed agricultural store 12.2m span x 23m long (5 No. 4.572m bays) x 4m to eaves to have a functional area for the storage of hay harvested from the surrounding field and dry storage for agricultural accessories
-
P/FUL/2026/03007 Granted
The Loft Loxley House Great Down Lane Marnhull Sturminster Newton DT10 1JY
Change of use of studio over carport to short term let
-
P/FUL/2026/02840 Awaiting decision
Land north of Avenue 50 Winfrith Nuclear Research Site Winfrith Newburgh Dorchester DT2 8WQ
Land remediation works involving the excavation of a section of pipeline and refilling/reprofiling of the land together with associated temporary soil storage area and contractors’ compound.