Planning application
6 North Street Beaminster DT8 3DZ
Works: Demolition
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Partial demolition of existing brick boiler house chimney
As published by the council, reference P/FUL/2025/06437
Application record
- Reference
- P/FUL/2025/06437
- Type
- Full Planning Application
- Status
- Application Approved
- Decision
- Granted
- Received
- 29 Oct 2025
- Validated
- 29 Oct 2025
- Decided
- 31 Dec 2025
- Ward
- Beaminster Ward
- Parish
- Beaminster
- Decision by
- Delegated
- Postcode
- DT8 3DZ
Site history
Applications at this address on the Dorset register
This site has had 4 applications since 2024: 4 approved, 0 refused.
-
P/NMA/2025/05973 Granted
6 North Street Beaminster DT8 3DZ
Non material amendment - Amendment to correct the drawing numbers listed under condition 2 on planning permission P/FUL/2025/02220 (Install new flues and carry out alterations to boiler room)
-
P/TRC/2024/06306 Granted
6 North Street Beaminster DT8 3DZ
T1 - T14 Cypress - Reduce in height by approx 4m (1/3 of current height)
-
P/NMA/2024/05492 Granted
6 North Street Beaminster DT8 3DZ
Non-material amendment to Planning permission P/FUL/2024/03731 (Alterations to cladding of part of existing industrial buildings - first floor) -Change to elevations to replace vertical composite profiled metal panels with horizontal composite profiled metal panels and adjustment to window height.
Timeline
Dates from the published record
-
29 Oct 2025
Received by Dorset
-
31 Dec 2025
Decision issued: Granted
-
26 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
17 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Dorset granted permission on 31 December 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
6 North Street Beaminster DT8 3DZ
Non material amendment - Amendment to correct the drawing numbers listed under condition 2 on planning permission P/FUL/2025/02220 (Install new flues and carry out alterations to boiler room)
Granted Amendments 6 docs -
6 North Street Beaminster DT8 3DZ
T1 - T14 Cypress - Reduce in height by approx 4m (1/3 of current height)
Granted Trees 5 docs -
-
6 North Street Beaminster DT8 3DZ
Non-material amendment to Planning permission P/FUL/2024/03731 (Alterations to cladding of part of existing industrial buildings - first floor) -Change to elevations to replace vertical composite profiled metal panels with horizontal composite profiled metal panels and adjustment to window height.
Granted Amendments Windows or glazing 4 docs -
2 The Walnuts Prout Bridge Beaminster DT8 3AY
Replacement of 2no. windows to rear elevation
Granted Heritage and listed buildings Windows or glazing 10 docs -
The Walnuts 2 Prout Hill Beaminster DT8 3AY
T1 Juvenile Acacia - Reduce height by 2m & width by 1.5m
Granted Trees 7 docs
Other full applications
In Dorset
-
P/FUL/2026/05392 Awaiting decision
Ashleigh Farm Dottery Road Salwayash DT6 5HT
Change of use from residential dwelling to short-term holiday let accommodation, including associated internal alterations & minor external modifications
-
P/FUL/2026/04413 Granted
Lynch Farm Icen Lane Shipton Gorge DT6 4PP
Erect a Rural Workers Dwelling.
-
P/FUL/2026/02312 Withdrawn
1,2 & 3 Church Cottages High Street Ashmore Salisbury SP5 5AF
Form new entrance & parking area, boundary wall to be realigned and rebuilt
-
P/FUL/2026/04384 Granted
Lifeboat House Peveril Point Road Swanage BH19 2AY
Install information boards. Erect courtyard stone walls (to replace sections of existing metal rail guarding). Install an Air Source Heat Pump (ASHP)
-
P/FUL/2026/02776 Granted
Poxwell Lower Dairy Poxwell DT2 8ND
Site 1no. mobile home for a dairy worker (to continue occupation of mobile home by an agricultural worker consented under P/FUL/2021/00157).