Skip to content
PlanIndex Get alerts
Menu

Planning application

Wabey House 156 Church Street Weymouth DT3 5QE

Refused Dorset P/FUL/2025/06424 Full Planning Application

Works: Extension

Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.

Proposal

Conversion and extension of coach house to create 2 Holiday lets and an Annexe to the main house

As published by the council, reference P/FUL/2025/06424

Application record

Reference
P/FUL/2025/06424
Type
Full Planning Application
Status
Application Refused
Decision
Refused
Received
27 Jan 2026
Validated
27 Jan 2026
Decided
2 Apr 2026
Ward
Upwey and Broadwey Ward
Parish
Weymouth
Decision by
Delegated
Postcode
DT3 5QE

Timeline

Dates from the published record

  1. 27 Jan 2026

    Received by Dorset

  2. 2 Apr 2026

    Decision issued: Refused

  3. 11 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

30 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What refusal means

The process from here

The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.

Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Wabey House 156 Church Street Weymouth DT3 5QE

    P/TRC/2026/04072 Submitted 27 Jul 2026 23m away

    T8 Magnolia - Fell

    Decided Trees 5 docs
  • 156 Church Street Upwey Weymouth DT3 5QE

    P/TRC/2025/05017 Submitted 12 Sep 2025 26m away

    T1 Redwood - Remove broken branch T2 Walnut - Reduce back limbs growing into redwood by 2m T3 Copper Beech - Raise crown overhanging main road & roof of building by 2m T4 Copper Beech - Section fell to ground level T5 Redwood - Remove dead top T6 London Plane - Reduce back limbs growing over road by 3-4m T7 & T8 Holly - Section fell to ground level T10 Lawson Cypress - Remove limb overhanging road T11 Yew - Reduce & raise crown by 2m

    Granted Trees 5 docs
  • Brook House 162 Church Street Weymouth DT3 5QE

    P/TRC/2026/00008 Submitted 5 Jan 2026 60m away

    Ginkgo (T1) - Pollard to a bare trunk removing all regrowth and lateral branches

    Withdrawn Trees 4 docs
  • Brook House 162 Church Street Weymouth DT3 5QE

    P/TRC/2026/00528 Submitted 29 Jan 2026 60m away

    Ginkgo (T1) - Crown raise to 3m and reduce lateral spread by up to 2m

    Decided Trees 4 docs
  • 164 Church Street Weymouth DT3 5QE

    P/TRC/2024/05793 Submitted 8 Oct 2024 97m away

    T1 & T2 Apple - Re-pollard back to previous cuts, approx 11ft from the ground

    Granted Trees 4 docs
  • Mill House Church Street Upwey Weymouth DT3 5QE

    P/TRD/2025/06315 Submitted 23 Oct 2025 101m away

    T1 Willow - Remove Under Regulation 14 (S198)

    Granted Trees 5 docs

In Dorset

  • P/FUL/2026/04686 Awaiting decision

    Hut 5 Field 768 Access Track To Fields 758 And 766 To 769 Portland Bill Portland

    Dismantle existing structure and replace with timber clad hut

    2 Sep 2026 Full applications
  • P/FUL/2026/04184 Awaiting decision

    Crumpets Farm Crumpets Farm Drive Lytchett Matravers BH16 6AL

    Partial change of use of site to form area for 2 No. short term holiday let pods and access to highway

    1 Sep 2026 Full applications
  • 15 Regents Court Victoria Road Swanage BH19 1LY

    Erect block of garages, with 5 individual garage spaces

    7 Jul 2026 Full applications
  • Unit D Link Estate Blackhill Road Holton Heath Trading Park Holton Heath BH16 6LS

    Demolish existing office building and use land as open air commercial storage, plus installation of 2.0 metre high palisade fencing

    3 Mar 2026 Full applications
  • P/FUL/2026/04684 Awaiting decision

    23 Gorse Lane Upton BH16 5RR

    Installation of outdoor air conditioning unit

    1 Sep 2026 Full applications