Skip to content
PlanIndex Get alerts
Menu

Planning application

P/FUL/2025/05820

9 High East Street Dorchester DT1 1HS

Granted Dorset Full Planning Application

Proposal

Change of use of ground floor to residential in association with the existing residential use

As published by the council, reference P/FUL/2025/05820

Timeline

Dates from the published record

  1. 15 Oct 2025

    Received by Dorset

  2. 2 Dec 2025

    Decision issued: Granted

  3. 26 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 10 High East Street Dorchester DT1 1HS

    Erect first floor extension to provide 1 No. unit of residential accommodation

    5 Apr 2023 8m away Full applications
  • 10 High East Street Dorchester DT1 1HS

    Erect first floor extension to provide 1 No. unit of residential accommodation

    5 Apr 2023 8m away Heritage and listed buildings
  • 1 Icen Way Dorchester DT1 1EW

    Removal of an internal wall on both the ground and first floors, together with a modern timber post. New internal walling will be formed to create a small first-floor bathroom.

    18 Dec 2025 21m away Heritage and listed buildings
  • P/LBC/2026/03458 Awaiting decision

    2 Icen Way Dorchester DT1 1EW

    Replacement of two wooden ground floor windows and one wooden door to single story rear extension

    24 Jun 2026 22m away Heritage and listed buildings
  • 47- 48 High East Street Dorchester DT1 1HU

    Redevelopment of the site to refurbish No.47, conversion the rear of the building to a house (use class C3). Demolish and reconstruct No.48 to provide a ground floor commercial unit (use classes E or Public House (sui generis)) & 4no. flats above & erection of 5no. dwellings (three houses & two flats) with associated access & landscaping at the rear

    5 Aug 2021 64m away Full applications
  • 7 Greenings Court Dorchester DT1 1HR

    Birch (T1) - Fell Pittosporum (T2) - Reduce height by 2.5m and lateral growth by 0.5m all around

    21 Oct 2025 79m away Trees

In Dorset

  • Steepleton Manor Residential Home B3159 Junction A35T To Rew Manor Winterbourne Steepleton DT2 9LG

    Proposed change of use including alterations to form 14 residential flats with ancillary accommodation and communal facilities, new bin store, car parking and access

    7 May 2025 Full applications
  • The Barn Shepherds Hill Buckhorn Weston SP8 5HX

    Erection of 1no. dwelling

    22 Sep 2025 Full applications
  • Land off Netherhay Lane Drimpton Beaminster DT8 3FS

    Erect steel framed agricultural store 12.2m span x 23m long (5 No. 4.572m bays) x 4m to eaves to have a functional area for the storage of hay harvested from the surrounding field and dry storage for agricultural accessories

    27 Apr 2026 Full applications
  • The Loft Loxley House Great Down Lane Marnhull Sturminster Newton DT10 1JY

    Change of use of studio over carport to short term let

    3 Jun 2026 Full applications
  • P/FUL/2026/02840 Awaiting decision

    Land north of Avenue 50 Winfrith Nuclear Research Site Winfrith Newburgh Dorchester DT2 8WQ

    Land remediation works involving the excavation of a section of pipeline and refilling/reprofiling of the land together with associated temporary soil storage area and contractors’ compound.

    28 Jul 2026 Full applications