Skip to content
PlanIndex Get alerts
Menu

Planning application

20 Abbey Road West Moors Dorset BH22 0AX

Granted Dorset P/FUL/2024/04588 Full Planning Application

Works: Demolition Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolish existing dwelling and erect new 4-bedroom property

As published by the council, reference P/FUL/2024/04588

Application record

Reference
P/FUL/2024/04588
Type
Full Planning Application
Status
Application Approved
Decision
Granted
Received
6 Sep 2024
Validated
6 Sep 2024
Decided
11 Dec 2024
Ward
West Moors and Three Legged Cross Ward
Parish
West Moors
Decision by
Delegated
Postcode
BH22 0AX

Timeline

Dates from the published record

  1. 6 Sep 2024

    Received by Dorset

  2. 11 Dec 2024

    Decision issued: Granted

  3. 3 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

30 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 29 Abbey Road West Moors BH22 0AX

    P/HOU/2025/07086 Submitted 27 Nov 2025 99m away

    Single storey rear and side extensions. Convert garage. Rebuild existing single-storey front extension, roof extension to sides to form rooms in roof-space, and dormers to front and rear. Raise chimney, add PV panels, add air source heat pump.

    Granted Householder Extension Loft or dormer 14 docs
    Small domestic
  • 139 Pinehurst Road West Moors Ferndown BH22 0AN

    P/TRD/2025/06247 Submitted 20 Oct 2025 120m away

    Silver Birch - Fell.

    Granted Trees 2 docs
  • 20 Monks Close West Moors BH22 0HE and 11 Monks Close West Moors BH22 0HE

    P/TRT/2025/05481 Submitted 16 Sep 2025 179m away

    T1 Silver Birch: Crown reduce by approximately 2M in height and shape the side growth in to suit ensuring that all cuts are pruned back to growth points. T2 English Oak (located in 11 Monks Close): Reduce individual overextending and or encroaching limbs growing towards 20 Monks Close to give a radial clearance of 2.5-3M from the trees nearest foliage and the property.

    Split decision Trees 4 docs
  • 5 The Coppice West Moors BH22 0GA

    P/CLP/2026/02419 Submitted 6 May 2026 180m away

    Erection of a single-storey detached outbuilding within the rear garden of the dwellinghouse.

    Granted Lawful development 7 docs
    Small domestic
  • 3A Abbey Road West Moors BH22 0AU

    P/TRT/2025/06647 Submitted 6 Nov 2025 197m away

    T1 English Oak: Reduce overextended branches growing over neighbouring property back by no more than 2m from the tips inwards.

    Granted Trees 4 docs
  • 5 The Coppice West Moors BH22 0GA

    P/VOC/2024/06449 Submitted 5 Nov 2024 198m away

    Raise hip to gable and ground floor rear infill extension (with variation of condition 2 of planning permission P/HOU/2024/04801 to vary the plans to enable door to side elevation, additional roof light and add glazed window to ground floor elevation to match existing)

    Granted Amendments Extension Loft or dormer +1 5 docs

In Dorset

  • P/FUL/2026/04686 Awaiting decision

    Hut 5 Field 768 Access Track To Fields 758 And 766 To 769 Portland Bill Portland

    Dismantle existing structure and replace with timber clad hut

    2 Sep 2026 Full applications
  • P/FUL/2026/04184 Awaiting decision

    Crumpets Farm Crumpets Farm Drive Lytchett Matravers BH16 6AL

    Partial change of use of site to form area for 2 No. short term holiday let pods and access to highway

    1 Sep 2026 Full applications
  • 15 Regents Court Victoria Road Swanage BH19 1LY

    Erect block of garages, with 5 individual garage spaces

    7 Jul 2026 Full applications
  • Unit D Link Estate Blackhill Road Holton Heath Trading Park Holton Heath BH16 6LS

    Demolish existing office building and use land as open air commercial storage, plus installation of 2.0 metre high palisade fencing

    3 Mar 2026 Full applications
  • P/FUL/2026/04684 Awaiting decision

    23 Gorse Lane Upton BH16 5RR

    Installation of outdoor air conditioning unit

    1 Sep 2026 Full applications