Planning application
P/FUL/2023/00742
10 Windsor Terrace Lyme Regis DT7 3AN
Proposal
Erection of self-contained annexe (or holiday let) and erect rear extension and first floor side extension.
As published by the council, reference P/FUL/2023/00742
Timeline
Dates from the published record
-
6 Mar 2023
Received by Dorset
-
28 Mar 2023
Decision issued: Withdrawn
-
31 Jul 2026
Added to PlanIndex
What withdrawal means
The process from here
The applicant withdrew this application before the council decided it, so it carries no planning weight and no fee refund is automatic. Withdrawal often follows officer feedback that a refusal was likely.
The applicant is free to submit a revised application at any time, and many withdrawn schemes return in amended form, so the site is worth watching if the proposal affected you.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
P/HOU/2026/03673 Awaiting decision
50 Kings Way Lyme Regis DT7 3DU
Demolition of link-detached outbuilding, construction of two storey side extension and formation of parking area
-
P/TRT/2025/06232 Granted
The Larches Roman Road Lyme Regis DT7 3HA
T1 & T2 Pine - Removal of major dead wood from both canopies combined with weight reduction via branch shortening by up to approximately 2500mm with cut diameters up to approximately 75mm T3 Sycamore - Reduce canopy extension over client land only via branch shortening by up to approximately 2000mm with cut diameters up to 50mm T4 Birch - Reduce canopy by up to approximately 1500mm with cut diameters up to 40mm
-
P/VOC/2025/05952 Withdrawn
3 Dolphin Close Lyme Regis DT7 3PW
Construction of single storey extension, ramped access, driveway and mobility scooter store (with variation of condition no.2 to planning permission P/HOU/2025/01940 - to remove ramped access approach, existing stepped access replaced with new, minor amendments to scooter store)
-
P/HOU/2025/07251 Granted
3 Dolphin Close Lyme Regis DT7 3PW
Proposed Single Storey Extension, Formation of Driveway & Mobility Scooter Storage together with other minor alterations
-
P/TRT/2024/05348 Granted
Charmouth Court Fairfield Park Lyme Regis DT7 3DS
T1 & T2 Cupressus Macrocarpa - Cut back branches as per annotated photos submitted (cuts no greater than 100mm) except 1 lower limb on T1 will be taken back to nearest growth point. Cut out any deadwood & broken limbs.
-
P/ESC/2025/06777 Decided
Pumping Station Colway Lane Lyme Regis
Request for EIA Screening Opinion under Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for the proposed construction of a new below ground storage tank
Other full applications applications
In Dorset
-
P/FUL/2025/01842 Granted
Steepleton Manor Residential Home B3159 Junction A35T To Rew Manor Winterbourne Steepleton DT2 9LG
Proposed change of use including alterations to form 14 residential flats with ancillary accommodation and communal facilities, new bin store, car parking and access
-
P/FUL/2025/05287 Granted
The Barn Shepherds Hill Buckhorn Weston SP8 5HX
Erection of 1no. dwelling
-
P/FUL/2026/02163 Refused
Land off Netherhay Lane Drimpton Beaminster DT8 3FS
Erect steel framed agricultural store 12.2m span x 23m long (5 No. 4.572m bays) x 4m to eaves to have a functional area for the storage of hay harvested from the surrounding field and dry storage for agricultural accessories
-
P/FUL/2026/03007 Granted
The Loft Loxley House Great Down Lane Marnhull Sturminster Newton DT10 1JY
Change of use of studio over carport to short term let
-
P/FUL/2026/02840 Awaiting decision
Land north of Avenue 50 Winfrith Nuclear Research Site Winfrith Newburgh Dorchester DT2 8WQ
Land remediation works involving the excavation of a section of pipeline and refilling/reprofiling of the land together with associated temporary soil storage area and contractors’ compound.