Skip to content
PlanIndex Get alerts
Menu

Planning application

P/ESP/2025/07145

Land at Caswell Farm Common Lane Ryme Intrinseca Sherborne DT9 6JP

Decided Dorset EIA Scoping Opinion

Proposal

Request for EIA Scoping Opinion under Regulation 15 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for the proposed constructrion of a solar farm (up to 40MW) with associated approx. 20MW Battery Energy Storage System (BESS), associated infrastructure and ancillary works.

As published by the council, reference P/ESP/2025/07145

Timeline

Dates from the published record

  1. 28 Nov 2025

    Received by Dorset

  2. 23 Dec 2025

    Decision issued: Scoping opinion adopted

  3. 26 Jul 2026

    Added to PlanIndex

After the decision

The process from here

The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.

If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.

About outline applications

How this application type works

An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.

More on outline applications in our guide

Nearby applications

Within 500 metres

  • P/FUL/2025/03066 Awaiting decision

    Land at Caswell Farm Common Lane Ryme Intrinseca Sherborne DT9 6JP

    Construct solar farm (up to 40 MW) with associated (approximately) 20 MW Battery Energy Storage System (BESS); comprising the erection of solar panels mounted on frames; a 132 kV DNO Substation compound; containerised battery units; centralised inverter housing, substation building; water storage tanks; spares container; perimeter fencing with CCTV cameras and access gates. Form new vehicular access (from Cuckoo Hill Road), modify existing accesses, form access tracks and temporary construction compounds. Install underground cabling and all ancillary grid infrastructure. Carry out landscaping and associated site works.

    19 Aug 2025 0m away Full applications

In Dorset

  • Longham Lakes Ringwood Road Longham

    Request for EIA screening

    29 Jun 2026 Outline
  • P/ESC/2026/03961 Awaiting decision

    Land North Of Leigh Road Wimborne Minster

    Proposed Development comprising residential development at land off Wimborne Road, Colehill for the erection of 124 dwellings with access from Leigh Road, on-site SANG, open space, landscaping, supporting infrastructure and associated engineering works Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (amended 2018) - Regulation 6 Request for a Screening Opinion

    22 Jul 2026 Outline
  • Dorchester Water Recycling Centre St Georges Road Dorchester DT1 1PE

    EIA Screening Request for treatment works upgrade.

    24 Jun 2026 Outline
  • 74 Wareham Road Corfe Mullen BH21 3LG

    Demolish the existing bungalow and erect 8no. houses with shared vehicular access and parking. As amended by plans rec'd 11/4/26 to reduce depth of dwelling at Plot 7 (landscaping is a reserved matter)

    22 Jan 2026 Outline
  • 175 Station Road West Moors BH22 0HX

    Erect two x 2no bedroom flats with a bike and bin store Access, Appearance, Layout and Scale for consideration

    6 Mar 2026 Outline