Proposal

Outline application for the erection of a new Yorkshire Ambulance Service Hub on approx 0.93 ha of land (Approval being sought for Access ) (being application under Regulation 4 Town and Country Planning (General) Regulation 1992)

As published by the council, reference 16/02779/4OUT

Timeline

Dates from the published record

  1. 3 Nov 2016

    Received by Doncaster

  2. 4 Nov 2016

    Validated

    Checked as complete and ready for consideration.

  3. 6 Jan 2017

    Decision issued: Application Withdrawn

  4. 22 Jul 2026

    Added to PlanIndex

What withdrawal means

The process from here

The applicant withdrew this application before the council decided it, so it carries no planning weight and no fee refund is automatic. Withdrawal often follows officer feedback that a refusal was likely.

The applicant is free to submit a revised application at any time, and many withdrawn schemes return in amended form, so the site is worth watching if the proposal affected you.

About outline applications

How this application type works

An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.

More on outline applications in our guide

Nearby applications

Within 500 metres

  • 16/02759/FUL Granted

    Keepmoat Stadium Stadium Way Lakeside Doncaster DN4 5JW

    Installation of new maintenance/sports equipment storage container, laying of artificial grass pitch and erection of fenced enclosure (upto 6m high)

    31 Oct 2016 242m away Full applications
  • 26/00595/COND Granted

    Wincanton Middle Bank House Middle Bank Lakeside Doncaster DN4 5PF

    Consent, agreement or approval required by condition 3 (Noise from fixed plant and equipment) of planning application 25/00812/FULM

    26 Mar 2026 452m away Conditions
  • 26/01301/COND Awaiting decision

    Wincanton Middle Bank House Middle Bank Lakeside Doncaster DN4 5PF

    Consent, agreement or approval required by condition 4 (Indoor noise levels) of planning application 25/00812/FULM

    9 Jul 2026 452m away Conditions
  • 16/02799/FUL Granted

    82 South Street Hyde Park Doncaster DN4 5AE

    Change of use of house to 4 bedroom/ 7 person house in multiple occupation and erection of two storey extension to rear

    4 Nov 2016 499m away Full applications

In Doncaster

  • 26/01202/SCRE Decided

    Land Off Barnsley Road At A1(M) Junction 37 Scawsby Doncaster DN5 7UE

    Request for an EIA screening opinion for proposed development of a motorway service station with associated new access, infrastructure and landscaping.

    22 Jun 2026 Outline
  • 26/00094/SCRE Decided

    Land South Of Ladycroft Road Armthorpe Doncaster

    Request for a screening opinion for residential development comprising up to 200 new homes together with associated public open space, landscaping, and drainage infrastructure

    16 Jan 2026 Outline
  • 26/01028/SCRE Decided

    Land On The North East Side Of Littleworth Lane Rossington Doncaster DN11 0HH

    Request for an EIA screening opinion for proposed demolition of existing agricultural buildings and the erection of residential dwellings with all associated works including landscaping, infrastructure and footpath link

    27 May 2026 Outline
  • 26/01295/SCRE Awaiting decision

    Land Off Hurst Lane Auckley Doncaster DN9 3HQ

    Request for a screening opinion for the erection of a residential development, a care home and a place of worship, with all associated works

    7 Jul 2026 Outline
  • 26/01114/SCRE Decided

    Land To The South Of Barnsley Road, To The East And West Of Marr Grange Lane, Marr

    Request for a screening opinion to determine whether proposals comprising the installation of a ground mounted photovoltaic farm with associated infrastructure, engineering works, access, and landscaping, together with works associated with the grid connection underground cable route corridor to the point of connection substation, comprises Environmental Impact Assessment (EIA) development.