Erection of a ground floor extension to side and rear of semi detached house

As published by the council, reference 16/01373/FUL

Timeline

Dates from the published record

  1. 19 May 2016

    Received by Doncaster

  2. 23 May 2016

    Validated

    Checked as complete and ready for consideration.

  3. 12 Jul 2016

    Decision issued: Planning Permission GRANTED

  4. 22 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 14/01191/FUL Granted

    57 Rosedale Road Scawsby Doncaster DN5 8SU

    Erection of two storey pitched roof extension to side of semi detached house following demolition of existing single storey extension

    22 May 2014 0m away Full applications
  • 04/0584/P Granted

    18, Barnsley Road, Doncaster, DN5 8QJ

    Erection of two storey pitched roof extension and conservatory to rear of semi detached house

    6 Feb 2004 233m away Full applications
  • 16/00469/FUL Granted

    5 Barnsley Road Scawsby Doncaster DN5 8QJ

    Erection of single storey extension to side of dwelling

    17 Feb 2016 233m away Full applications
  • 16/02073/COND Decided

    69 Norman Crescent Sunnyfields Doncaster DN5 8RS

    Consent, agreement or approval required by conditions 3, 4, 5 and 6 of planning application 16/01208/FUL

    10 Aug 2016 278m away Conditions
  • 16/01208/FUL Granted

    Side Of 69 Norman Crescent Sunnyfields Doncaster DN5 8RS

    Erection of detached house following demolition of two pre-fabricated garages

    28 Apr 2016 278m away Full applications
  • 03/1636/P Granted

    5, Sherwood Avenue, Scawsby

    ERECTION OF FIRST FLOOR PITCHED ROOF EXTENSION OVER COVERED DRIVEWAY EXTENSION TO SIDE OF SEMI DETACHED HOUSE

    21 Mar 2003 319m away Full applications

In Doncaster

  • 26/00924/FUL Refused

    Capita Balby Carr Bank Balby Doncaster DN4 8DH

    Open Storage (Use Class B8) including the formation of internal access off existing internal access road, and installation of perimeter fencing.

    13 May 2026 Full applications
  • 26/01191/FUL Granted

    21 Short Road Intake Doncaster DN2 6NR

    Extension and conversion of existing garage/outbuilding to form ancillary family annexe accommodation, including bedroom/sitting area, shower room, storage and refreshment point only, without independent kitchen facilities.

    22 Jun 2026 Full applications
  • 26/00028/FUL Granted

    15A Partridge Flatt Road Bessacarr Doncaster DN4 6SB

    Erection of new 5no bedroom self-build dwelling and detached garage following the demolition of existing bungalow and garage

    7 Jan 2026 Full applications
  • 26/00957/FUL Granted

    242 Cantley Lane Cantley Doncaster DN4 6QT

    Erection of a two storey front, side and rear extension, detached annex and detached double garage and rebuild the site entrance

    18 May 2026 Full applications
  • 26/00859/FUL Granted

    377 Goodison Boulevard Cantley Doncaster DN4 6RW

    Erection of front porch extension, first floor side extension, rear extension to garage and installation of hipped garage roof to create roofspace for an en-suite including external alterations