Planning application
The Harlequinn Thorne Doncaster DN8 4DG
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of 4 semi detached houses.
As published by the council, reference 15/03001/FUL
Application record
- Reference
- 15/03001/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Planning Permission GRANTED
- Received
- 23 Dec 2015
- Validated
- 29 Dec 2015
- Decided
- 20 May 2016
- Ward
- Thorne And Moorends
- Parish
- Thorne Town Council
- Decision by
- Delegated
- Postcode
- DN8 4DG
Timeline
Dates from the published record
-
23 Dec 2015
Received by Doncaster
-
29 Dec 2015
Validated
Checked as complete and ready for consideration.
-
20 May 2016
Decision issued: Planning Permission GRANTED
-
24 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a design practice
43 applications on PlanIndex · 86% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
23 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
22, Millfield Road, Thorne, Doncaster, DN8 4DG
Erection of conservatory to rear of semi detached house
Granted Full applications New dwelling Extension -
Rear Of 89 King Edward Road Thorne Doncaster South Yorkshire DN8 4DE
ERECTION OF TWO SELF CONTAINED FLATS (10.0M X 4.7M) ON APPROX 0.06 HA OF LAND
Granted Full applications New dwelling -
The Harlequin King Edward Road Thorne Doncaster DN8 4DE
Consent, agreement or approval required by conditions 3 (Contaminated land assessment), 4 (Rep unexpected cont on sensitive sites), 5 (Material imported onto sensitive sites), 6 (Drainage details be agreed before start), 7 ( Discharge of Surface Water) of planning application 23/01032/FUL
Granted Conditions 13 docs -
73A King Edward Road Thorne Doncaster DN8 4DE
Consent, agreement or approval required by condition 10 (Ecological enhancement plan) of planning application 22/01381/FUL
Decided Conditions 5 docs -
The Harlequin King Edward Road Thorne Doncaster DN8 4DE
Consent, agreement or approval required by conditions 3 (Contaminated Land Assessment), 6 (Foul, Surface Water and Land Drainage Systems), 7 (Surface Water Drainage Works), 8 (Landscaping and Natural Ground Treatments), 14 (External Materials) and 15 (Boundary Treatments) of planning application 23/01032/FUL
Split decision Conditions 18 docs -
89 King Edward Road Thorne Doncaster DN8 4DE
Replacement of existing flat roof to new pitched roof over unit 3 and change of use of land to the rear from residential to be used for associated car parking
Granted Full applications 15 docs
Other full applications applications
In Doncaster
-
26/01054/FUL Granted
Plumbs Estate Sandall Stones Road Kirk Sandall Doncaster DN3 1QR
Erection of an office building
-
26/01211/FUL Granted
65 - 67 Nether Hall Road Doncaster DN1 2QA
Change of use from office to mixed-use retail/restaurant, changes to ground floor front windows and entrance doors and installation of extraction flue to rear of building.
-
26/00877/FUL Refused
14 School Lane Auckley Doncaster DN9 3JR
Conversion of existing outbuilding following partial demolition and erection of a side extension to form a 1 bedroom annex and change of use of outbuilding from office to form part of residential annex (Amended Plans and Description)
-
26/01006/FUL Granted
Coney Garth High Street Barnby Dun Doncaster DN3 1DY
Erection of a 2 storey side extension and dormers installed to rear and front of main roof of the property
-
25/01104/COU Granted
Pavilion Town Field Thorne Road Doncaster DN1 2JS
Change of use of part of the existing building from F2 ( Local Community Use Sports Facility) to include mixed use Class E(b) (Café/Restaurant) and Class E(c) Meeting Rooms.