Planning application
Blackergreen Farm Blacker Green Lane Owston Doncaster DN5 0LY.
Works: Roofing Demolition Windows or glazing Domestic
Read from the description, not a valuation. How we read the register
Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.
Proposal
Change of use of agricultural barn to residential dwelling including installation of new doors and windows, replacement roof and demolition of existing pig sty
As published by the council, reference 14/02846/PMBPA
Application record
- Reference
- 14/02846/PMBPA
- Type
- Prior App from AGR to Residential
- Status
- Decided
- Decision
- Prior Approval Refused
- Received
- 3 Dec 2014
- Validated
- 10 Dec 2014
- Decided
- 2 Feb 2015
- Ward
- Norton And Askern
- Parish
- Owston Parish Council
- Decision by
- Delegated
- Postcode
- DN5 0LY
Timeline
Dates from the published record
-
3 Dec 2014
Received by Doncaster
-
10 Dec 2014
Validated
Checked as complete and ready for consideration.
-
2 Feb 2015
Decision issued: Prior Approval Refused
-
6 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
12 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this refusal means
Doncaster refused this application for the reasons on the decision notice; only the applicant can appeal, and refused schemes often return in revised form. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Blacker Green Farm Blacker Green Lane Owston Doncaster DN5 0LY.
Conversion of existing barn to dwelling including formation of two parking spaces and temporary siting of caravan
Granted Full applications 25 docsDomestic -
Blacker Green Farm Blacker Green Lane Owston Doncaster South Yorkshire DN5 0LY
Erection of two storey pitched roof extension to side of detached house
Granted Full applications New dwelling Extension 3 docs -
Blacker Green Farm Blacker Green Lane Owston Doncaster DN5 0LY
Consent, agreement or approval required by condition 3 (Ecological Enhancement Plan) of application 21/02381/FUL
Granted Conditions 4 docs -
Crossing Gate Farm Storrs Lane Owston Doncaster DN5 0LX
Erection of agricultural building (15m X 18m)
Granted Other 5 docs -
Thorpe Grange Farm Thorpe Grange Lane Moss Doncaster DN5 0LZ
86% historically approved · decision due ~16 Jun
Erection of a free range egg laying unit and associated infrastructure, including upgraded site access and an attenuation pond (AMENDED PLANS AND RED LINE SITE AREA)
Awaiting decision Full applications 99 docsMajor scheme
Other outline applications
In Doncaster
-
26/01295/SCRE Decided
Land Off Hurst Lane Auckley Doncaster DN9 3HQ
Request for a screening opinion for the erection of a residential development, a care home and a place of worship, with all associated works
-
26/01513/SCRE Awaiting decision
Land On The West Side Of Ferndale Drive Moorends Doncaster DN8 4SE
Request for a screening opinion for a proposed residential development
-
26/01417/OUT Awaiting decision
Land Adjacent To 20 Carr Lane Bessacarr Doncaster DN4 7PX
Outline application with some reserved matters for erection of a single storey 4-bedroom bungalow with integrated garage (Approval sought for Access, Layout and Scale)
-
26/01410/OUT Awaiting decision
Land Rear Of 51 Cowper Road Mexborough S64 0LH
Outline application for the erection of 2 bedroom dwelling with associated parking and amenity space on approx 0.01 ha of land (Approval being sought for access)
-
26/01202/SCRE Decided
Land Off Barnsley Road At A1(M) Junction 37 Scawsby Doncaster DN5 7UE
Request for an EIA screening opinion for proposed development of a motorway service station with associated new access, infrastructure and landscaping.