Planning application
04/5314/P
Land To Rear Of 93 Ellison Street Thorne Doncaster South Yorkshire DN8 5LJ
Proposal
Outline application for one detached dwelling on approx 0.03 ha of land
As published by the council, reference 04/5314/P
Timeline
Dates from the published record
-
2 Aug 2004
Received by Doncaster
-
24 Sep 2004
Decision issued: Planning Permission GRANTED
-
22 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About outline applications
How this application type works
An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.
Nearby applications
Within 500 metres
-
16/02703/FUL Granted
79 Ellison Street Thorne Doncaster DN8 5LJ
Proposed erection of detached garage to rear of existing semi dwelling.
-
05/0277/P Granted
Land To Rear Of 93 Ellison Street Thorne Doncaster South Yorkshire DN8 5LJ
Details of siting, design, external appearance and means of access to detached house on approximately 0.03ha of land (Being Matters Reserved in Outline Application granted under Ref 04/5314/P on 24.09.04)
-
26/00844/FUL Granted
85 Ellison Street Thorne Doncaster DN8 5LJ
Formation of a dropped kerb to the front of the property
-
26/01142/CPL Granted
37 Ash Tree Road Thorne Doncaster DN8 5LL
Certificate of proposed lawful development for thermal improvement works to existing solid wall construction with EWI to increase the overall Energy Efficiency Rating
-
16/02725/FUL Granted
1 Thorne Hall Court Ellison Street Thorne Doncaster DN8 5LE
Erection of 5 detached houses, 2 detached garages and conversion of office building to detached house (being resubmission of application 15/02286/FUL granted on 02.12.2015) 1. (Revised siting and size of Plot 1 and associated alterations)
-
16/02708/COND Granted
DMBC Offices Ellison Street Thorne Doncaster DN8 5LE
Consent, agreement or approval required by conditions 05, 06, 10, 11, 12 & 17 of planning application 15/02286/FUL
Other outline applications
In Doncaster
-
26/01202/SCRE Decided
Land Off Barnsley Road At A1(M) Junction 37 Scawsby Doncaster DN5 7UE
Request for an EIA screening opinion for proposed development of a motorway service station with associated new access, infrastructure and landscaping.
-
26/00094/SCRE Decided
Land South Of Ladycroft Road Armthorpe Doncaster
Request for a screening opinion for residential development comprising up to 200 new homes together with associated public open space, landscaping, and drainage infrastructure
-
26/01028/SCRE Decided
Land On The North East Side Of Littleworth Lane Rossington Doncaster DN11 0HH
Request for an EIA screening opinion for proposed demolition of existing agricultural buildings and the erection of residential dwellings with all associated works including landscaping, infrastructure and footpath link
-
26/01295/SCRE Awaiting decision
Land Off Hurst Lane Auckley Doncaster DN9 3HQ
Request for a screening opinion for the erection of a residential development, a care home and a place of worship, with all associated works
-
26/01114/SCRE Decided
Land To The South Of Barnsley Road, To The East And West Of Marr Grange Lane, Marr
Request for a screening opinion to determine whether proposals comprising the installation of a ground mounted photovoltaic farm with associated infrastructure, engineering works, access, and landscaping, together with works associated with the grid connection underground cable route corridor to the point of connection substation, comprises Environmental Impact Assessment (EIA) development.