Planning application
04/0128/P
10 Whin Hill Road Bessacarr Doncaster South Yorkshire DN4 7AF
Proposal
Outline application for the erection of 2 no. dwellings on approx 0.12Ha of land following demolition of existing dwelling
As published by the council, reference 04/0128/P
Timeline
Dates from the published record
-
12 Jan 2004
Received by Doncaster
-
23 Apr 2004
Decision issued: Application Withdrawn
-
22 Jul 2026
Added to PlanIndex
What withdrawal means
The process from here
The applicant withdrew this application before the council decided it, so it carries no planning weight and no fee refund is automatic. Withdrawal often follows officer feedback that a refusal was likely.
The applicant is free to submit a revised application at any time, and many withdrawn schemes return in amended form, so the site is worth watching if the proposal affected you.
About outline applications
How this application type works
An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.
Nearby applications
Within 500 metres
-
03/3703/P Granted
32, Whin Hill Road, Doncaster, DN4 7AF
Erection of single storey pitched roof extension to replace existing at rear of detached house
-
15/01693/TCON Decided
9 Whin Hill Road Bessacarr Doncaster DN4 7AF
Conservation Area Notification to remove Lawson Cypress x5; being within the Bessacarr Conservation Area
-
03/3348/P Decided
29, Whin Hill Road, Bessacarr, Doncaster, DN4 7AF
Erection of detached office/store building (Approx 6.8m x 4.5m & 3.0m x 5.3m) and erection of brick/railing boundary wall including entrance gates at 2.7m high overall to front of detached house
-
02/1855/P Granted
Cantley Water Tower Church Lane Cantley Doncaster South Yorkshire DN4 7AF
ERECTION OF 3 DISH ANTENNAE, 3 SECTOR ANTENNAE AND 2 EQUIPMENT CABINETS
-
13/00744/TPO Decided
25A Whin Hill Road Bessacarr Doncaster DN4 7AF
Consent to remove one Rowan tree being subject to G113 of Doncaster Borough Council Tree Preservation Order no.64: Bessacarr with Cantley (1991)
-
13/00585/TCON Decided
27 Whin Hill Road Bessacarr Doncaster DN4 7AF
Conservation Area Notification to remove Oak x1; Pine x 2; Larch x1 from rear garden; deadwood and crown lift to 3-4m avenue feature (conifer x10 lining drive); crown lift to 3-4m Lawson Cypress x2 in front of house; all trees being within the Bessacarr Conservation Area
Other outline applications
In Doncaster
-
26/01202/SCRE Decided
Land Off Barnsley Road At A1(M) Junction 37 Scawsby Doncaster DN5 7UE
Request for an EIA screening opinion for proposed development of a motorway service station with associated new access, infrastructure and landscaping.
-
26/00094/SCRE Decided
Land South Of Ladycroft Road Armthorpe Doncaster
Request for a screening opinion for residential development comprising up to 200 new homes together with associated public open space, landscaping, and drainage infrastructure
-
26/01028/SCRE Decided
Land On The North East Side Of Littleworth Lane Rossington Doncaster DN11 0HH
Request for an EIA screening opinion for proposed demolition of existing agricultural buildings and the erection of residential dwellings with all associated works including landscaping, infrastructure and footpath link
-
26/01295/SCRE Awaiting decision
Land Off Hurst Lane Auckley Doncaster DN9 3HQ
Request for a screening opinion for the erection of a residential development, a care home and a place of worship, with all associated works
-
26/01114/SCRE Decided
Land To The South Of Barnsley Road, To The East And West Of Marr Grange Lane, Marr
Request for a screening opinion to determine whether proposals comprising the installation of a ground mounted photovoltaic farm with associated infrastructure, engineering works, access, and landscaping, together with works associated with the grid connection underground cable route corridor to the point of connection substation, comprises Environmental Impact Assessment (EIA) development.