Planning application
Land To Rear Of 11 And 12 Silver Birch Grove Finningley Doncaster South Yorkshire DN9 3EQ
Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.
Proposal
Outline application for erection of three detached dwellings on approx 0.18 ha of land
As published by the council, reference 03/3392/P
Application record
- Reference
- 03/3392/P
- Type
- Outline Application
- Status
- Decided
- Decision
- Planning Permission REFUSED
- Received
- 7 May 2003
- Validated
- 7 May 2003
- Decided
- 1 Jul 2003
- Ward
- (Historic) Finningley
- Parish
- Finningley Parish Council
- Postcode
- DN9 3EQ
Timeline
Dates from the published record
-
7 May 2003
Received by Doncaster
-
1 Jul 2003
Decision issued: Planning Permission REFUSED
-
17 Aug 2026
Added to PlanIndex
What this refusal means
Doncaster refused this application for the reasons on the decision notice; only the applicant can appeal, and refused schemes often return in revised form. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
9 Silver Birch Grove Finningley Doncaster South Yorkshire DN9 3EQ
Erection of first floor pitched roof extension above existing at side of detached house
Granted Full applications New dwelling Extension -
16 Silver Birch Grove Finningley Doncaster South Yorkshire DN9 3EQ
ERECTION OF GROUND FLOOR CONSERVATORY/PITCHED ROOF EXTENSION AT REAR AND FIRST FLOOR PITCHED ROOF EXTENSION OVER EXISTING GARAGE AT SIDE OF SEMI DETACHED HOUSE
Granted Full applications New dwelling Extension -
Finningley C Of E Primary School Silver Birch Grove Finningley Doncaster South Yorkshire DN9 3EQ
Erection of single storey extension (approximately 18.5m x 12.5m) following removal of existing temporary classroom
Granted Full applications ExtensionSmall domestic -
40, Elm Drive, Finningley
ERECTION OF PITCHED ROOF FIRST FLOOR EXTENSION ABOVE EXISTING TO SIDE OF DETACHED DWELLING
Granted Full applications New dwelling ExtensionDomestic -
28 Wroot Road Finningley Doncaster DN9 3DN
Consent, agreement or approval required by conditions 3 (contaminated land/ remedial strategy), 4 (Rep unexpected cont on sensitive sites), 5 (material imported onto sensitive sites), 7 (EV charging point), 8 (materials), 9 (windows and doors), 10 (roof lights), 13 (drainage) and 17 (footpath/verge) of planning application 21/02964/FUL
Split decision Conditions Loft or dormer Windows or glazing 13 docs -
21 And 23 Wroot Road Finningley Doncaster South Yorkshire DN9 3DN
Erection of brick boundary wall, part with wood panels, part with metal railings (2.3M high overall) to front of detached dwellings
Granted Full applicationsSmall domestic
Other outline applications
In Doncaster
-
26/01295/SCRE Decided
Land Off Hurst Lane Auckley Doncaster DN9 3HQ
Request for a screening opinion for the erection of a residential development, a care home and a place of worship, with all associated works
-
26/01513/SCRE Awaiting decision
Land On The West Side Of Ferndale Drive Moorends Doncaster DN8 4SE
Request for a screening opinion for a proposed residential development
-
26/01417/OUT Awaiting decision
Land Adjacent To 20 Carr Lane Bessacarr Doncaster DN4 7PX
Outline application with some reserved matters for erection of a single storey 4-bedroom bungalow with integrated garage (Approval sought for Access, Layout and Scale)
-
26/01410/OUT Awaiting decision
Land Rear Of 51 Cowper Road Mexborough S64 0LH
Outline application for the erection of 2 bedroom dwelling with associated parking and amenity space on approx 0.01 ha of land (Approval being sought for access)
-
26/01202/SCRE Decided
Land Off Barnsley Road At A1(M) Junction 37 Scawsby Doncaster DN5 7UE
Request for an EIA screening opinion for proposed development of a motorway service station with associated new access, infrastructure and landscaping.