Planning application
03/1448/P
Tyrham Hall Hotel Bawtry Road Hatfield Woodhouse Doncaster South Yorkshire DN7 6DR
Proposal
OUTLINE APPLICATION FOR HOTEL DEVELOPMENT ON APPROX 1.0 HA OF LAND
As published by the council, reference 03/1448/P
Timeline
Dates from the published record
-
12 Mar 2003
Received by Doncaster
-
1 Dec 2004
Decision issued: Application Withdrawn
-
22 Jul 2026
Added to PlanIndex
What withdrawal means
The process from here
The applicant withdrew this application before the council decided it, so it carries no planning weight and no fee refund is automatic. Withdrawal often follows officer feedback that a refusal was likely.
The applicant is free to submit a revised application at any time, and many withdrawn schemes return in amended form, so the site is worth watching if the proposal affected you.
About outline applications
How this application type works
An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.
Nearby applications
Within 500 metres
-
04/4336/P Granted
Tyram Lakes Bawtry Road Hatfield Woodhouse Doncaster South Yorkshire DN7 6DR
Application for removal of condition 7 of previous permission granted under 03/5887/P on 14/06/04 - condition limiting occupation of dwelling.
-
04/4037/P Refused
Tyrham Hall Hotel Bawtry Road Hatfield Woodhouse Doncaster South Yorkshire DN7 6DR
Relocation/replacement of exisiting motel accommodation on approximately 0.1ha of land following demolition of existing building
-
18/01524/COND Granted
Lakeside Restaurant Tyrham Lakes Bawtry Road Hatfield Woodhouse Doncaster DN7 6DR
Consent, agreement or approval required by condition 6 of planning application 16/01202/FULM - Amended details.
-
03/5570/P Granted
Tyrham Hall Fisheries Bawtry Road Hatfield Woodhouse Doncaster South Yorkshire DN7 6DR
Variation of condition 01 of planning permission 00/51/0082/P/FUL (construction of islands in fishing lake) granted on appeal 23.03.01. to extend planning permission expiry date from 31.12.03. to 31.12.2004.
-
03/5442/P Granted
Tyrham Hall Fisheries Bawtry Road Hatfield Woodhouse Doncaster South Yorkshire DN7 6DR
Erection of building (15.0m x 10.0m) incorporating cafe, tackle shop, ticket and security office with associated facilities
-
16/02690/FUL Awaiting decision
Tyrham Lakes Bawtry Road Hatfield Woodhouse Doncaster DN7 6DR
Proposed erection of motel following demolition of existing
Other outline applications
In Doncaster
-
26/01202/SCRE Decided
Land Off Barnsley Road At A1(M) Junction 37 Scawsby Doncaster DN5 7UE
Request for an EIA screening opinion for proposed development of a motorway service station with associated new access, infrastructure and landscaping.
-
26/00094/SCRE Decided
Land South Of Ladycroft Road Armthorpe Doncaster
Request for a screening opinion for residential development comprising up to 200 new homes together with associated public open space, landscaping, and drainage infrastructure
-
26/01028/SCRE Decided
Land On The North East Side Of Littleworth Lane Rossington Doncaster DN11 0HH
Request for an EIA screening opinion for proposed demolition of existing agricultural buildings and the erection of residential dwellings with all associated works including landscaping, infrastructure and footpath link
-
26/01295/SCRE Awaiting decision
Land Off Hurst Lane Auckley Doncaster DN9 3HQ
Request for a screening opinion for the erection of a residential development, a care home and a place of worship, with all associated works
-
26/01114/SCRE Decided
Land To The South Of Barnsley Road, To The East And West Of Marr Grange Lane, Marr
Request for a screening opinion to determine whether proposals comprising the installation of a ground mounted photovoltaic farm with associated infrastructure, engineering works, access, and landscaping, together with works associated with the grid connection underground cable route corridor to the point of connection substation, comprises Environmental Impact Assessment (EIA) development.