Ward · Derry City and Strabane
Planning applications in Claudy
Page 2 of 2, newest first. Back to the Claudy overview.
Applications in Claudy
Newest first · page 2 of 2
-
LA11/2024/0802/O Granted
Lands adjacent and to the west of No. 8 Clon Road, Eglinton, BT47 3AX.
Two no. infill dwellings.
-
LA11/2024/0616/RM Granted
Site to the rear of 29 Brockagh Road, Tamnaherin, BT47 3AT
Proposed dwelling and garage
-
LA11/2024/0421/F Granted
Lands adjacent to 19a Cumber View (sites 20 and 21). Claudy, BT47 4HS
Erection of 2 no. Dwellings (change of house types as previously approved under A/2006/0175/F)
-
LA11/2024/0161/F Granted
Approx. 25 metres west of 58 Muldonagh Road, Claudy, Co Derry
Single storey dwelling
-
LA11/2024/0135/F Granted
Lands between 126A & 130 Highmoor Road, Londonderry, BT47 3HS
Erection of 1 No. infill Dwelling and Garage to Previously Approved Application LA11/2018/0710/F - (Change of House Type)
-
LA11/2024/0111/F Granted
Existing Slievekirk Windfarm. Lands bounded by Bigwood Road, Kildoag Road and Castlewarren Road, within the townlands of Lisdillon, Kildoag in Co. Derry, Knockbrack, Gosheden, Lackagh, Ardground, Legagh in Co. Tyrone
Engineering work to 12 turbine bases at Slievekirk windfarm consisting of new concrete on top of the existing concrete slab and the reprofiling of ground around turbine 11 to accommodate excess material from the works
-
LA11/2023/2161/O Granted
Lands approximately 300m South East of No. 11a Monnaboy Road, Derryarkin, Derry, BT47 3AZ
Dwelling on a Farm in conjunction with Policy CTY 10 of PPS 21
-
LA11/2023/2081/F Granted
Lands south east of 567 Baranailt Road Claudy BT47 4EF
Proposed dwelling & garage on a farm
-
LA11/2023/2057/O Granted
Lands Approximately 170 metres South of 14 Myrtle Road, Slagtmanus, Derry / L'Derry BT47 3HW
Dwelling on a Farm
-
LA11/2023/2016/F Granted
385m South East of Nos 608 and 610 Baranailt Road and 350m North East of No 614 Baranailt Road (off A6 Foreglen Road), Claudy, Co Londonderry, BT47 4EA
The removal of existing 13.50 M. high CCI steel monopole and associated radio cabin and replacement with a 22.50 M. high swann lattice tower in a new concrete base, 3 No. (VM) antennas, 3 No. (VM) dishes, 1 No. (VM) GPS module, 2 No. cabinets and ancillary development thereto.
-
LA11/2023/1754/F Granted
1000m North of 62 Muldonagh Road, Claudy, BT47 4EJ
Proposed erection of new 78m hub height and 82m rotor diameter wind turbine (3MW)
-
LA11/2023/1649/O Refused
Site Adjacent to No. 149 Tamnaherin Rd, Cross, BT47 3NP
Proposed site for infill dwelling
-
LA11/2023/1533/F Granted
Lands North of 338-340 Glenshane Road, Claudy
Proposed Residential Development comprising of 15 No. Units to include 3 No. detached, 12 No. semi-detached, landscaping, driveways, garages, car parking and all associated site and access works (Proposal includes demolition of 1 No. dwelling to allow for realignment of road access and upgrade of private road as approved under LA11/2020/0017/RM to an adoptable standard).(Amendments to Scheme)
-
LA11/2023/1501/F Granted
50 M. North West of 32 Foreglen Road, Killaloo, Derry/Londonderry, BT47 3TP
Retention of existing farm shed measuring 425 square metres
-
LA11/2023/1462/F Awaiting decision
Approximately 100 M. South West of 15 Edenreagh Road, Eglinton, BT47 3AS
Proposed vehicle storage building, extension to yard (retrospective) and all associated site works (amended proposal description)
-
LA11/2023/1442/O Withdrawn
Lands approx 35 M. S.E. of 35 Edenreagh Road, Derry, BT47 3NQ
Proposed site for dwelling and garage
-
LA11/2023/1446/F Granted
54, 56 & 58 Main Street & associated lands to the rear of 637-645 Baranalt Road, Claudy, BT47
Demolition of all buildings on site and construction of replacement supermarket (including off licence) and offices, parking and fuel pump. Please Note updated information received: Drawings 03Rev2; 05Rev2; 06Rev2; 07Rev3; 09Rev3 & 11Rev1; 14; 15; 16; 17 letter from Lisbane consulting dated 04 February 2025 to address traffic information
-
LA11/2023/1314/DC Granted
Faughan Valley Woodland Lands 675m north-north-west of 90 Ardground Road Kilaloo Londonderry BT47 3TB
Discharge of Conditions: 2, 3 and 4 of LA11/2020/0296/F relating to a final Construction Method Statement/CEMP and SUDS.
-
LA11/2023/1245/A Granted
Our Lady of Fatima Primary School Ervey Road, Tamnaherin, BT47 3AU
Total of 19 No. signs, including 15 post mounted in curtilage signage and 4 wall mounted signs, in aluminium with white reflective black plate and black text/arrows, includes one larger wall mounted powder coated aluminum sign
-
LA11/2023/1227/DC Granted
Brackfield Wood, Approx 150m south west of No. 250 Glenshane Road, BT47 3SN
Discharge of Condition: 6 of planning approval LA11/2019/0719/F relating to otters.
-
LA11/2023/0003/F Granted
Site 35 M. East of No. 9 Greenmount Gardens, Claudy, BT47 4HS
Erection of 4 dwellings, 2no detached and 1no pairs of semi detached dwellings with incurtilage car park spaces with on street car parking spaces (Change of house type from previously approved 2 no detached dwellings under planning approval A/2006/0175/F)
-
LA11/2023/0002/DC Granted
Brackfield Wood Woodland Trust 268 Glenshane Road Londonderry BT47 3SN
Discharge of Condition: 4 of LA11/2021/0175/F Condition 4: No development shall commence on site (including demolition, site clearance and site preparation) unless a final Construction and Environmental Management Plan has been submitted by the appointed contractor to the planning authority and approved in writing by Council. These plans should contain all the appropriate environmental mitigation as within the CEMPS by Euro Services Contracts Ltd, dated April 2022 and as advised by NIEA NED in their response 03/10/2022. Reason: To ensure the project will not have an adverse effect on the integrity of any European site and to protect Northern Ireland priority habitats and species, to ensure implementation of mitigation measures identified within the Environmental Statement and to prevent likely significant effects on the River Faughan and Tributaries SAC/ASSI.
-
LA11/2022/1172/DC Granted
Oaks Wood, Woodland Trust, Glenshane Road BT47 3EW
Discharge of Condition: 2 & 3 of LA11/2022/0024/F 2. No development shall commence on site (including demolition, site clearance and site preparation) unless a final Construction Environmental Management Plan has been submitted by the appointed contractor to the planning authority and approved in writing by Council. This should reflect all the mitigation, and avoidance measures to be employed as outlined in the outline Construction Environment Management Plan (April 2022) and include specific mitigation for the watercourse crossing. The approved CEMP shall be adhered to and implemented throughout the construction period in accordance with the approved details, unless otherwise agreed in writing by the planning authority. Reason: To ensure the project will not have an adverse effect on the integrity of any European site. 3. A detailed Construction Method Statement, for works in, near or liable to affect any waterway as defined by the Water (Northern Ireland) Order 1999, must be submitted to NIEA Water Management Unit, at least 8 weeks prior to the commencement of the works or phase of works. Reason: To ensure effective avoidance and mitigation measures have been planned for the protection of the water environment.
-
LA11/2022/1171/DC Granted
Woodland Trust, Red Brae, Lands 675m NNW of 90 Ardground Road Kilalloo Londonderry BT47 3TB
Discharge of Condition: 2 of LA11/2021/0186/F 2. No development shall commence on site (including demolition, site clearance and site preparation) unless a final Construction and Environmental Management Plan has been submitted by the appointed contractor to the planning authority and approved in writing by Council. The CEMP shall include the following: a) Construction methodology and timings of works; b) Pollution Prevention Plan; including suitable buffers between the location of all construction works, storage of excavated spoil and construction materials, any refuelling, storage of oil/fuel, concrete mixing and washing areas and any watercourses or surface drains present on or adjacent to the site; c) Site Drainage Management Plan; including Sustainable Drainage Systems (SuDS), foul water disposal and silt management measures; d) Spoil Management Plan; including identification of spoil storage areas, management and handling of spoil and details of the reinstatement of excavated soil; e) Water Quality Monitoring Plan; f) Environmental Emergency Plan; g) Details of the appointment of an Ecological Clerk of Works (ECoW) and their roles and responsibilities. h) identify all potential risks to the adjacent watercourses and must incorporate all of the pollution prevention measures included in the Outline Construction Environmental Management Plan stamped 03/05/2022 and all details requested by NIEA NED in their consultation response dated 20/06/2022. The approved CEMP shall be implemented in accordance with the approved details and all works on site shall conform to the approved CEMP, unless otherwise agreed in writing by the Planning Authority. Reason: To ensure the project will not have an adverse effect on the integrity of any European site and to protect Northern Ireland priority habitats and species, to ensure implementation of mitigation measures identified within the Environmental Statement and to prevent likely significant effects on the River Faughan and Tributaries SAC/ASSI.
-
LA11/2022/1144/DC Granted
Brackfield Wood, Approx. 150m South West of No. 250 Glenshane Road, Londonderry, BT47 3SN
Discharge of Conditions: 4 and 5 of LA11/2019/0719/F 4. A Final Construction Environmental Management Plan must be submitted by the appointed contractor to the planning authority prior to work commencing. This shall reflect all the mitigation and avoidance measures detailed in the outline CEMP and the Preliminary Ecological Appraisal. The final CEMP should also confirm: - The timing of piling works to take account of the recommendation of NIEA NED. As timings of piling in relation to salmon run will depend on the location of the site within a catchment and the related salmon peak run timing through that area, this should be confirmed with Loughs Agency; - The type of scour protection and the method of installation to demonstrate that it prevents undercutting from river erosion processes; - a drainage plan to confirm the finalised site drainage and confirm if any SuDS is required. The approved CEMP shall be adhered to and implemented throughout the construction period in accordance with the approved details, unless otherwise agreed in writing with by the planning authority. Reason: To ensure that the appointed contractor undertaking the work is fully appraised of all the risks associated with the proposal and to provide effective mitigation ensuring there are no adverse impacts on the integrity of River Faughan and Tributaries SAC. 5. A detailed Construction Method Statement (CMS) must be submitted to NIEA Water Management Unit, at least eight weeks prior to the commencement of construction.The CMS should include all necessary pollution prevention measures to protect the water environment during the development of this proposal. Reason: To ensure effective avoidance and mitigation measures have been planned for the protection of the water environment. Faughan Valley Red Brae Trails and Timber Footbridge CEMP, October 2022 (CMS contained within)
-
LA11/2022/1137/DC Granted
Faughan Valley Woodland, Lands 675 M. N.N.W. of 90 Ardground Road, Kilaloo, Londonderry
Discharge of condition Nos. 2 and 4 of planning permission LA11/2020/0296/F - Relating to Construction Environmental Management Plan
-
LA11/2022/1142/PAN Granted
54, 56 & 58 Main Street & 645 Baranailt Road and associated lands to the rear, and lands to the rear of 637-645 Baranailt Road, Claudy Londonderry BT47 4HR
Replacement supermarket and offices, parking and fuel pump.
-
LA11/2022/1056/F Granted
52 Barr Cregg Claudy Co Derry BT47 4DU
Single storey rear and side extension to existing two storey dwelling
-
LA11/2022/1023/F Granted
22 Barr Cregg Claudy Co Derry BT47 4DU
Construction of proposed single storey side and rear extension to dwelling
-
LA11/2022/0984/F Granted
10 Slaughtmanus Road Tamnhaerin Derry BT47 3EX
Single storey extension to the rear and side, and new garage.
-
LA11/2022/0914/F Granted
59 Cumber View Claudy Derry BT47 4FG
Proposed partial change of use from dwelling to creche and dropped kerbs at entrance to site
-
LA11/2022/0734/RM Granted
Adjacent to and south of 18 Birch Road Tamnymore Cross L'Derry
In-fill Dwelling and garage and associated site works
-
LA11/2021/0900/F Granted
99 Tamnaherin Road The Cross Derry BT47 3NP
Proposed ramp access to front of dwelling
-
LA11/2021/0820/RM Granted
Approx 120m south of 15 Gosheden Road Londonderry
Proposed one and a half storey detached dwelling and single storey detached garage
-
LA11/2021/0817/RM Granted
Between 61 & 63A Muldonagh Road Claudy Co. Derry BT47 4EH
Reserved matters application for proposed dwelling with detached domestic garage on an infill site
-
LA11/2021/0378/O Granted
200m south of 18 Highmoor Road Cross BT47 3AY
Proposed dwelling on a farm
-
LA11/2021/0305/F Granted
Adjacent to 33 Muldonagh Road Claudy BT47 4EH
Construction of Farm and agricultural machinery store to serve existing farm business
-
LA11/2021/0296/F Granted
91 Main Street Claudy BT47 4BH
Amended Plans Internal alterations to No. 91 and demolition of detached garage to rear. Extension of curtilage of No. 91 and erection of extension/ancillary accommodation to the rear of No. 91 to provide ancillary living accomodation
-
LA11/2020/0988/RM Granted
Lands adjacent to 22 Slaughtmanus Road Tamnanerin Eglinton L'Derry
The erection of farm dwelling and garage on gap site
-
LA11/2020/0203/F Awaiting decision
160m South East of 23 Foreglen Road L'Derry BT47 3SW
Retention of 1.7m average land infilling across site (amended description)