Planning application
The subject site is located to the South West of the Coolkeeragh Power Station. It is on land directly east of the existing Coolkeeragh 110 kV substation
Works: Extension
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Extension of the 110KV substation and replacement of existing steel terminal tower with a new tower and extension of existing control room with associated works (including remediation of contaminated land, access/hardstanding, earthworks, drainage, temporary compound, temporary wastewater treatment plant and replacement of existing substation electrical components)
As published by the council, reference LA11/2026/0637/PAN
Application record
- Reference
- LA11/2026/0637/PAN
- Type
- Proposal of Application Notice
- Status
- Determined
- Decision
- Granted As published: Acceptable
- Received
- 28 Aug 2026
- Validated
- 4 Sep 2026
- Decided
- 4 Sep 2026
- Ward
- Enagh
Timeline
Dates from the published record
-
28 Aug 2026
Received by Derry City and Strabane
-
4 Sep 2026
Validated
Checked as complete and ready for consideration.
-
4 Sep 2026
Decision issued: Acceptable
-
12 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
3 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Derry City and Strabane granted permission on 4 September 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Derry City and Strabane's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
Maydown Works, Derry, BT47 6TH
Discharge of Condition Nos. 2, 6 & 8 of planning permission - LA11/2021/0909/F ; Relating to (2) Remediation Strategy & (6 & 8) Construction Environmental Management Plan
Granted Conditions 20 docs