Planning application

Site Bounded by Clooney Road (to the West) Crescent Link (to the South West) and Rossdowney Road (to the East)

Granted Derry City and Strabane LA11/2025/0400/S54 Section 54

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Section 54 application to vary 3 No. conditions of planning permission LA11/2016/0422/O - Condition No. 45 which read 'On approval of the detailed design pursuant to condition 44 and prior to the occupation of more than 150 dwellings, the Developer shall complete construction of the upgrade/mitigation works and signalisation required to the Gransha Roundabout junction. Reason: To ensure that the road works considered necessary to provide a proper, safe and convenient means of access to the development are carried out at the appropriate time and address the cumulative traffic impact of the development' to read 'Prior to the occupation of more than 195 dwellings, the developer shall complete construction of the upgrade/mitigation works to the Gransha Roundabout junction, as indicated on drawing no. XXX date published XXX. Reason: To ensure that the road works considered necessary to provide a proper, safe and convenient means of access to the development are carried out at the appropriate time and address the cumulative traffic impact of the development' - Condition No. 46 which read 'No more than 300 dwellings shall be occupied within the development until the highway works required to the Caw Roundabout junction are agreed in writing with the Planning Authority and shall be generally as indicated on Drawings 15 and 16 date stamped 14th September 2018. As part of this submission a Stage 2 road safety audit shall be submitted to and approved in writing by the Planning Authority. Reason: To ensure that the road works necessary to provide a proper, safe and convenient means of access to the development are carried out at the appropriate time and address the cumulative traffic impact of the development' to read Prior to the occupation of more than 225 dwellings within the development as permitted, the detailed design of the highway works required to the Caw Roundabout junction shall be submitted and agreed in writing with the Planning Authority and shall be generally as indicated on drawing no. 15 date stamped 14th September 2018. As part of this submission a Stage 2 Road Safety Audit shall be submitted to and approved in writing by the Planning Authority. Reason: To ensure that the road works considered necessary to provide a proper, safe and convenient means of access to the development are carried out at the appropriate time and address the cumulative traffic impact of the development' Condition No. 47 which read 'No more than 300 dwellings shall be occupied within the development as permitted until the highway works required to the Caw Roundabout junction as agreed under condition 46 have been completed. Reason: To ensure that the road works necessary to provide a proper, safe and convenient means of access to the development are carried out at the appropriate time and address the cumulative traffic impact of the development' to read 'Prior to 30 November 2026 and prior to the occupation of more than 262 dwellings within the development as permitted, the highway works required to the Caw Roundabout junction as agreed under condition 46 shall be completed. Reason: To ensure that the road works necessary to provide a proper, safe and convenient means of access to the development are carried out at the appropriate time and address the cumulative traffic impact of the development'

As published by the council, reference LA11/2025/0400/S54

Application record

Reference
LA11/2025/0400/S54
Type
Section 54
Status
Determined
Decision
Granted
Received
6 Jun 2025
Validated
9 Jun 2025
Decided
22 May 2026
Ward
Enagh

Timeline

Dates from the published record

  1. 6 Jun 2025

    Received by Derry City and Strabane

  2. 9 Jun 2025

    Validated

    Checked as complete and ready for consideration.

  3. 22 May 2026

    Decision issued: Granted

  4. 27 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

15 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About this record

Reading the register

This page mirrors an entry on the statutory planning register that Derry City and Strabane is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.

Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.

Nearby applications

Within 500 metres