Planning application
98 Duke Street, Waterside, Londonderry, BT47 6DQ
Works: New dwelling Extension
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Retention of 3 Storey Extension to 3 no. Self-Contained Apartments at Rear of Existing Building Over Retail Unit on Ground-Floor
As published by the council, reference LA11/2023/2031/F
Application record
- Reference
- LA11/2023/2031/F
- Type
- Full
- Status
- Determined
- Decision
- Granted
- Received
- 2 Oct 2023
- Validated
- 20 Oct 2023
- Decided
- 23 Oct 2024
- Ward
- Victoria (Derry and Strabane)
- Postcode
- BT47 6DQ
Timeline
Dates from the published record
-
2 Oct 2023
Received by Derry City and Strabane
-
20 Oct 2023
Validated
Checked as complete and ready for consideration.
-
23 Oct 2024
Decision issued: Granted
-
27 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice
24 applications on PlanIndex · across 2 councils · 100% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
14 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
4 Spencer Road, Waterside, Derry, BT47 6AA
Retention of change of use from former bank to class C2; Guest house as per the Planning (use classes) Order (NI) 2015
Granted Full applications 26 docs -
74 Duke Street Derry BT47 6PQ
98% historically approved · decision due ~30 Sep
Discharge of Condition No.s 8 and 9 of Planning Reference LA11/2023/1775/F; relating to NI Water
Awaiting decision Conditions 3 docs -
66-74 Duke Street 74 Duke Street, Derry, BT47 6AT
Discharge of Condition 4 of LA11/2020/0251/F relating to highway structure / retaining wall requiring Technical Approval by DFI Roads.
Decided Conditions 7 docs -
74 Duke Street, Derry, BT47 6AT
Discharge of Condition 3 of LA11/2023/1775/F relating to structure/retaining wall requiring Technical Approval by DFI Roads.
Decided Conditions 8 docs -
66-74 Duke Street, Derry, BT47 6AT
Discharge of Condition 3 of planning permission LA11/2020/0251/F - Relating to highway structure / retaining wall requiring Technical Approval by DFI Roads.
Decided Conditions 7 docs -
74 Duke Street Derry BT47 6AT
Discharge of Conditions 19, 20 & 21 of planning permission LA11/2023/1775/F -relating to glazing, noise and ventilation verification.
Decided Conditions Windows or glazing 20 docs
Other full applications applications
In Derry City and Strabane
-
LA11/2026/0173/F Granted
20 Drumnabey Road, Spamount, Castlederg, BT81 7NF
Proposed single storey side and front extensions and associated alterations to dwelling
-
LA11/2026/0007/F Granted
53 Oakbridge Park, Londonderry, BT48 8PY
Proposed single storey detached garage
-
LA11/2025/0434/F Granted
Lands within Ulster University, to the North of Clarence Avenue, adjacent to No. 21 Northland Road and East of 8, 8a and 8b Northland Road, Derry, BT48 7HZ
Proposed development of new teaching and student centre associated with Ulster University, bridge connection and alteration to existing buildings (MM and MU); Ancillary café, car parking, landscaping, Solar PV Panels, associated roof plant and machinery, alterations to existing service road & associated site and access works (relating to NI Water & SES information)
-
LA11/2026/0355/F Granted
46 Woodbrook West, Londonderry, BT48 8PZ
First floor side extension
-
LA11/2026/0538/F Granted
91 Ballymagowan Avenue, Londonderry, BT48 9QR
Construction of single storey rear extension to provide wheelchair accessible bedroom on ground floor. Associated landscaping / hardstanding to rear garden to facilitate and provide level access