Skip to content
PlanIndex Get alerts
Menu

Archive · Derry City and Strabane · 2022

Planning applications in Derry City and Strabane, December 2022

Derry City and Strabane recorded 36 planning applications in December 2022, listed newest first. Dates are as received, or as decided where the council publishes no submission date.

Applications, December 2022

Newest first

  • 99 Glenelly Road, Omagh, BT79 8BP

    Discharge of condition No. 2 of planning permission LA11/2021/0571/F - Historic Building Survey

    Submitted 27 Dec 2022 Conditions
  • 315 Lisnaragh Road, Omagh, BT79 8AS

    Proposed single storey extension to rear of existing dwelling house

    Submitted 27 Dec 2022 Full applications
  • 420 Carnhill, L'Derry, BT48 8BT

    Single storey rear extension

    Submitted 22 Dec 2022 Full applications
  • Lands accessed from Fincairn Road & Glenshane Road directly East of Copperthorpe housing development and c.270 meters North of The Beeches, Drumahoe, Co. Derry

    Discharge of condition No. 18 of planning permission LA11/2018/1131/RM - Relating to Archaeological Evaluation Report

    Submitted 21 Dec 2022 Conditions
  • 94 Stevenson Park, L'Derry, BT47 3QU

    Single storey rear extension to dwelling

    Submitted 20 Dec 2022 Full applications
  • Lands at and to the West of Sean Dolan GAC Grounds, Blighs Lane, Derry, BT48 9PJ

    Discharge of condition No. 6 of planning permission LA11/2019/0866/F - Relating to Landscape management & maintenance plan

    Submitted 19 Dec 2022 Conditions
  • Lands adjacent to Home Bargains, Melmount Road, Strabane, BT82 9ED

    Proposed Retail Unit with Associated Car Parking and Site and Access Works.

    Submitted 19 Dec 2022
  • 11 Bracken Gate, Strabane, BT82 8FE

    Single storey side & rear extension, front bay window to dwelling & reconfigured driveway

    Submitted 19 Dec 2022 Full applications
  • Site 35 M. East of No. 9 Greenmount Gardens, Claudy, BT47 4HS

    Erection of 4 dwellings, 2no detached and 1no pairs of semi detached dwellings with incurtilage car park spaces with on street car parking spaces (Change of house type from previously approved 2 no detached dwellings under planning approval A/2006/0175/F)

    Submitted 15 Dec 2022 Full applications
  • Approx. 230 M. S.S.E. of 193 Lisnaragh Road, Donemana, Tyrone

    Discharge of condition Nos. 26 & 27 of planning permission LA11/2020/0284/F - Archaeological Monitoring Report

    Submitted 15 Dec 2022 Conditions
  • Brackfield Wood Woodland Trust 268 Glenshane Road Londonderry BT47 3SN

    Discharge of Condition: 4 of LA11/2021/0175/F Condition 4: No development shall commence on site (including demolition, site clearance and site preparation) unless a final Construction and Environmental Management Plan has been submitted by the appointed contractor to the planning authority and approved in writing by Council. These plans should contain all the appropriate environmental mitigation as within the CEMPS by Euro Services Contracts Ltd, dated April 2022 and as advised by NIEA NED in their response 03/10/2022. Reason: To ensure the project will not have an adverse effect on the integrity of any European site and to protect Northern Ireland priority habitats and species, to ensure implementation of mitigation measures identified within the Environmental Statement and to prevent likely significant effects on the River Faughan and Tributaries SAC/ASSI.

    Submitted 15 Dec 2022 Conditions
  • 41 Lisaghmore Avenue, Londonderry, BT47 2JJ

    First floor wet room extension

    Submitted 15 Dec 2022 Full applications
  • 125-139 Strand Road, Londonderry, BT48 7PA

    Discharge of condition No. 14 of planning permission LA11/2019/0727/F - Noise & Verification Report

    Submitted 13 Dec 2022 Conditions
  • Oaks Wood, Woodland Trust, Glenshane Road BT47 3EW

    Discharge of Condition: 2 & 3 of LA11/2022/0024/F 2. No development shall commence on site (including demolition, site clearance and site preparation) unless a final Construction Environmental Management Plan has been submitted by the appointed contractor to the planning authority and approved in writing by Council. This should reflect all the mitigation, and avoidance measures to be employed as outlined in the outline Construction Environment Management Plan (April 2022) and include specific mitigation for the watercourse crossing. The approved CEMP shall be adhered to and implemented throughout the construction period in accordance with the approved details, unless otherwise agreed in writing by the planning authority. Reason: To ensure the project will not have an adverse effect on the integrity of any European site. 3. A detailed Construction Method Statement, for works in, near or liable to affect any waterway as defined by the Water (Northern Ireland) Order 1999, must be submitted to NIEA Water Management Unit, at least 8 weeks prior to the commencement of the works or phase of works. Reason: To ensure effective avoidance and mitigation measures have been planned for the protection of the water environment.

    Submitted 12 Dec 2022 Conditions
  • Woodland Trust, Red Brae, Lands 675m NNW of 90 Ardground Road Kilalloo Londonderry BT47 3TB

    Discharge of Condition: 2 of LA11/2021/0186/F 2. No development shall commence on site (including demolition, site clearance and site preparation) unless a final Construction and Environmental Management Plan has been submitted by the appointed contractor to the planning authority and approved in writing by Council. The CEMP shall include the following: a) Construction methodology and timings of works; b) Pollution Prevention Plan; including suitable buffers between the location of all construction works, storage of excavated spoil and construction materials, any refuelling, storage of oil/fuel, concrete mixing and washing areas and any watercourses or surface drains present on or adjacent to the site; c) Site Drainage Management Plan; including Sustainable Drainage Systems (SuDS), foul water disposal and silt management measures; d) Spoil Management Plan; including identification of spoil storage areas, management and handling of spoil and details of the reinstatement of excavated soil; e) Water Quality Monitoring Plan; f) Environmental Emergency Plan; g) Details of the appointment of an Ecological Clerk of Works (ECoW) and their roles and responsibilities. h) identify all potential risks to the adjacent watercourses and must incorporate all of the pollution prevention measures included in the Outline Construction Environmental Management Plan stamped 03/05/2022 and all details requested by NIEA NED in their consultation response dated 20/06/2022. The approved CEMP shall be implemented in accordance with the approved details and all works on site shall conform to the approved CEMP, unless otherwise agreed in writing by the Planning Authority. Reason: To ensure the project will not have an adverse effect on the integrity of any European site and to protect Northern Ireland priority habitats and species, to ensure implementation of mitigation measures identified within the Environmental Statement and to prevent likely significant effects on the River Faughan and Tributaries SAC/ASSI.

    Submitted 12 Dec 2022 Conditions
  • 16 Crockett Park, Castlederg, BT81 7BY

    Extension to Existing Bathroom

    Submitted 12 Dec 2022 Full applications
  • 21 Norburgh Park, Derry, BT48 0RG

    Access ramp and handrail to front of dwelling

    Submitted 12 Dec 2022 Full applications
  • 48 Whiterock Park, Castlederg, BT81 7DZ

    Extension to rear and side of dwelling to provide utility room and toilet to accomodate conversion of garage to bedroom and ensuite

    Submitted 12 Dec 2022 Full applications
  • 122 Northland Road Springtown Londonderry BT48 0LX

    Discharge of Condition 16, Asbestos Remediation Strategy, of reference number LA11/2020/0555/F

    Submitted 9 Dec 2022 Conditions
  • 125-135 Strand Road, Londonderry, BT48 7PA

    Discharge of condition No's 1, 2 & 3 of planning approval LA11/2021/0114/F

    Submitted 9 Dec 2022 Conditions
  • 122 Northland Road, Londonderry, BT48 0AW

    Discharge of condition No.s 14 and 17, land contamination, of planning permission LA11/2020/0555/F

    Submitted 9 Dec 2022 Conditions
  • 20 Prehen Road, Londonderry, BT47 2NS

    Proposed change of location for approved 2 storey music room & home studio to rear of dwelling - LA11/2022/0778/F

    Submitted 9 Dec 2022 Full applications
  • Brackfield Wood, Approx. 150m South West of No. 250 Glenshane Road, Londonderry, BT47 3SN

    Discharge of Conditions: 4 and 5 of LA11/2019/0719/F 4. A Final Construction Environmental Management Plan must be submitted by the appointed contractor to the planning authority prior to work commencing. This shall reflect all the mitigation and avoidance measures detailed in the outline CEMP and the Preliminary Ecological Appraisal. The final CEMP should also confirm: - The timing of piling works to take account of the recommendation of NIEA NED. As timings of piling in relation to salmon run will depend on the location of the site within a catchment and the related salmon peak run timing through that area, this should be confirmed with Loughs Agency; - The type of scour protection and the method of installation to demonstrate that it prevents undercutting from river erosion processes; - a drainage plan to confirm the finalised site drainage and confirm if any SuDS is required. The approved CEMP shall be adhered to and implemented throughout the construction period in accordance with the approved details, unless otherwise agreed in writing with by the planning authority. Reason: To ensure that the appointed contractor undertaking the work is fully appraised of all the risks associated with the proposal and to provide effective mitigation ensuring there are no adverse impacts on the integrity of River Faughan and Tributaries SAC. 5. A detailed Construction Method Statement (CMS) must be submitted to NIEA Water Management Unit, at least eight weeks prior to the commencement of construction.The CMS should include all necessary pollution prevention measures to protect the water environment during the development of this proposal. Reason: To ensure effective avoidance and mitigation measures have been planned for the protection of the water environment. Faughan Valley Red Brae Trails and Timber Footbridge CEMP, October 2022 (CMS contained within)

    Submitted 8 Dec 2022 Conditions
  • Faughan Valley Woodland, Lands 675 M. N.N.W. of 90 Ardground Road, Kilaloo, Londonderry

    Discharge of condition Nos. 2 and 4 of planning permission LA11/2020/0296/F - Relating to Construction Environmental Management Plan

    Submitted 8 Dec 2022 Conditions
  • 54 - 58 Main Street, Strabane, BT82 8AX

    2 Shop sign

    Submitted 8 Dec 2022 Advertising
  • 1 Daisy Park, Sion Mills, Co. Tyrone, BT82 9QD

    New modular building to be erected to the rear of the site to be used as an Irish Classroom for community use.

    Submitted 7 Dec 2022 Full applications
  • 120 metres North of No. 1 Templetown Mews, Maydown, Londonderry, BT47 6GY

    Proposed bus shelter

    Submitted 6 Dec 2022 Full applications
  • 120 metres North of No. 1 Templetown Mews, Maydown Londonderry BT47 6GY

    Advertisement on side of Bus Shelter

    Submitted 6 Dec 2022 Advertising
  • 36 Alderbrook, Eglinton, BT47 3WG

    Retention of single storey timber clad garden shed to provide garden storage and kids' playroom

    Submitted 6 Dec 2022 Full applications
  • 18 Melmount Road Ballycolman Strabane Tyrone BT82 9EE

    Proposed Bedroom and Wet room extension to rear of dwelling

    Submitted 6 Dec 2022 Full applications
  • 13 Hawthorn Drive, Derry, BT48 0GN

    Proposed single storey/side extension to dwelling to provide WC.

    Submitted 6 Dec 2022 Full applications
  • 54, 56 & 58 Main Street & 645 Baranailt Road and associated lands to the rear, and lands to the rear of 637-645 Baranailt Road, Claudy Londonderry BT47 4HR

    Replacement supermarket and offices, parking and fuel pump.

    Submitted 6 Dec 2022
  • LA11/2022/1114/DC Withdrawn

    127 Melmount Road, Sion Mills, Strabane, BT82 9HE

    Discharge of condition No. 3 of planning permission LA11/2020/0767/F - Construction and Environmental Management Plan

    Submitted 6 Dec 2022 Conditions
  • 11 Greeves Park, Strabane, BT82 9LG

    Proposed single storey/rear extension to dwelling, to provide bedroom with ensuite

    Submitted 5 Dec 2022 Full applications
  • 14 Prehen Road, Derry, BT47 2NS

    Single storey side extension, proposed glazed canopy & patio to existing single storey dwelling. All existing windows & doors to be replaced

    Submitted 5 Dec 2022 Full applications
  • Vacant lands on the former Ebrington Barracks site, located immediately East of building 80/81 and approx. 30 M. South East of Browning Drive, approx. 55 M. North of Ebrington Terrace and approx. 120 M. East of Ebrington Square, Limavady Road, Derry/Londonderry, BT47 6HN. Buildings 117/118 (and lands to the East) Limavady Road, Derry/Londonderry, BT47 6HN

    Public Consultation at Parcel “D” and “Part Parcel E” Former Ebrington Barracks Proposed development of Parcel D (Outlined Red on Plan) of former Ebrington Barracks site comprising 4 multi storey buildings including:- • Building D1 - Grade A Commercial Office building to 3 upper floors over Mixed Use (Cafe / Restaurant & own door Offices) at ground floor (Gross Internal Area ((GIA)) c.5,500m2). • Building D2 - Basement/Multi-Storey Car Park (MSCP) [2a] with wrap around Creative / Commercial Uses [2b & 2c]:- D2a - MSCP: 1 full basement level with 3 levels above ground (c.435 car parking spaces); D2b - Studios: Small 'own door' Creative Units. Approximately 100m2 over ground floor and mezzanine levels (GIA c.650m2) ; D2c - Single Commercial Unit. Approximately 330m2 over 2 storeys (GIA c.650m2). • Building D3 - Mixed Use block: Creative / Commercial & Ancillary uses at ground floor with 2 storeys of Residential use above (10 dwellings per floor. GIA c.2,800m2). • Building D4 - Mixed Use block: Creative / Commercial & Ancillary uses at ground floor with 2 storeys of Residential use above (6 dwellings per floor. GIA c.2,000m2). Also providing new public square, public realm works and associated site, access and landscaping works. Updates to Ebrington Development Framework Masterplan outlining indicative proposals for part Parcel E of former Ebrington Barracks site comprising 3 multi storey buildings E1, E2 & E3 providing Creative Industries / Serviced Office Space over 3 blocks (GIA c.5,000m2). Public Consultation for Parcel “F” and part Parcel “E” Former Ebrington Barracks Public Consultation for Parcel F and part Parcel E (Outlined Green on Plan) of former Ebrington Barracks site to provide 4 multi storey buildings for Residential Use and a Mixed Use development as follows: • Building F1/117 - Residential Block (as per Planning Permission LA11/2020/0010/F & LBC LA11/2020/0034/LBC); • Buildings F2 & F3 - Residential Blocks (4/5 storeys in height); and • Building E4 - Creative Industries / Serviced Office Space (GIA c.1,200m2 over 2 storeys). Ancillary site works (including demolition of Building 118) and landscaping and car parking.

    Submitted 2 Dec 2022

Other months in 2022

All of 2022