Skip to content
PlanIndex Get alerts
Menu

Planning application

44 Otter Street Derby DE1 3FB

Granted Derby 22/00120/FUL Full Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single storey rear extension to dwelling house

As published by the council, reference 22/00120/FUL

Application record

Reference
22/00120/FUL
Type
Full Application
Status
Decided
Decision
Approval
Received
25 Jan 2022
Validated
25 Jan 2022
Decided
14 Mar 2022
Ward
Darley Ward
Decision by
Delegated Decision
Postcode
DE1 3FB

Timeline

Dates from the published record

  1. 25 Jan 2022

    Received by Derby

  2. 14 Mar 2022

    Decision issued: Approval

  3. 25 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file

25 applications on PlanIndex · across 7 councils · 100% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 64 Otter Street Derby DE1 3FB

    20/00712/DISC Submitted 26 Jun 2020 6m away

    Demolition of wall. Engineering works to include erection of a stair shaft with spiral staircase, boundary wall and the installation of decking and new garage doors - Discharge of condition 3 of previously approved permission 20/00394

    Decided Conditions Demolition 6 docs
    Small domestic
  • 68 Otter Street Derby DE1 3FB

    26/00788/DISC Submitted 16 Jun 2026 7m away

    92% historically approved · decision due ~11 Aug

    Discharge of condition 3 (Materials) of previously approved application no. 24/01250/FUL - Installation of replacement windows to the front elevation, erection of front boundary wall and alterations to rear conservatory

    Awaiting decision Conditions Extension Windows or glazing
    Small domestic
  • 34 Otter Street Derby DE1 3FB

    26/00246/FUL Submitted 2 Mar 2026 33m away

    91% historically approved · decision due ~27 Apr

    Removal and replacement of front boundary wall - retrospective application

    Awaiting decision Full applications 11 docs
    Small domestic
  • 65 Otter Street Derby DE1 3FD

    20/00246/DISC Submitted 25 Feb 2020 38m away

    Installation of a replacement ground floor bay window to the front elevation and erection of a replacement boundary wall - Discharge of condtion 3 of previously approved application code No. 19/01132/FUL

    Decided Conditions Windows or glazing 4 docs
    Small domestic
  • 32 Otter Street Derby DE1 3FB

    25/00965/CAT Submitted 5 Jun 2025 40m away

    Felling of a Cherry tree within the Strutts Park Conservation Area

    Withdrawn Trees 3 docs
  • 59 Otter Street Derby DE1 3FD

    20/01386/FUL Submitted 5 Nov 2020 47m away

    Single storey side extension to dwelling house (enlargement of kitchen/dining area) and installation of roof lights to the front and rear elevations

    Granted Full applications Extension Loft or dormer 11 docs
    Small domestic

In Derby

  • 26/01122/FUL Awaiting decision

    11 Farncombe Lane Derby DE21 2AY

    Single storey front extension to dwelling (lobby and w.c) together with installation of log burner flue

    Full applications
  • 26/01169/FUL Awaiting decision

    5 Derwent Avenue Derby DE22 2DP

    Single storey side/rear extension to dwelling house (garage and dining area/snug)

    Full applications
  • 26/01173/FUL Awaiting decision

    Land At The Side Of 60 Coleman Street Derby DE24 8NL

    Erection of a dwelling house (Use Class C3)

    Full applications
  • 26/00913/FUL Awaiting decision

    Land Adjacent To 80 Fairfield Road Derby DE23 6PH

    Erection of a dwelling house (Use Class C3) - self and custom build development

    Full applications
  • 26/01166/FUL Awaiting decision

    16 Shakespeare Street Derby DE24 9HF

    Single storey front extension to dwelling house (porch)

    Full applications