Planning application
Gaerwen Wind Farm, Land Northwest Of Llandrillo, Corwen
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
DYLID CYFLWYNO UNRHYW SYLWADAU I PCAC AC NID I'R CYNGOR - [email protected] ******************************** ANY COMMENTS SHOULD BE SUBMITTED TO PEDW & NOT TO THE COUNCIL - [email protected] ******************************** Mae’r datblygiad yn cynnwys: Hyd at naw thyrbin a cyffyrdd trydan allanol. Sefyllfau caled craen ac ardaloedd ‘laydown’ wrth och phob thyrbin. Tua 7.5km o trac (7.3km o faint fydd yn drac newydd ac 0.2km) o drac fodol) a gweithgareddau peirianneg cysylltiedig. Is-safle trydanol ac adeilad rheoli; System storio batri egni. Cyffyrdd dan ddaear trydanol yn cysylltu’r tyrbin i’r Is-Safle trydanol. Chwe croes cwrs ddŵr a gweithgareddau cysylltiedig. Ardaloedd basio a troi cerbydau. Arwyddion ar y safle. Goleuadau awyrenau. Ffatri swpio ac adeulau dros/dro man storio cyfansoddion fferm gwynt a cynigion rheoli cynefinoedd / The proposed development consists of: up to nine wind turbines and external electrical cubicles; crane hardstandings and adjacent laydown areas for each turbine location; approximately 7.5 km of access tracks (of which approximately 7.3 km will be new track and, 0.2 km will be upgraded existing track) and associated ancillary engineering works; an electrical substation and control building; battery energy storage system; onsite underground electrical cables linking the turbines and the onsite substation; six watercourse crossings and associated infrastructure; onsite vehicle turning heads and passing places; site signage; aviation lighting temporary concrete batching plant and construction / storage compounds for the wind farm, up to two Borrow pits and habitat management proposals
As published by the council, reference DNS/3276735
Application record
- Reference
- DNS/3276735
- Type
- Development of National Significance
- Received
- 11 Sep 2025
Timeline
Dates from the published record
-
11 Sep 2025
Received by Denbighshire
-
7 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 6 November 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Checking the current position
The published feed does not show a live status for this application; the register on Denbighshire's own portal holds the authoritative version.
About this record
The published feed does not state which type of application this is; the register entry on Denbighshire's portal will say. Our guide explains the common types.