Planning application

Bluewater Shopping Centre Greenhithe Kent

Granted Dartford 26/00644/VCON

Relates to 25/00920/FUL

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Temporary use of part of the existing car park, including the siting of prefabricated buildings and canopy block, to facilitate the storage and collection of electric cars together with parking for courtesy and staff cars (retrospective) (Variation of condition 1 of planning permission DA/25/00920/FUL to re-site and slightly amend the type/size of the approved prefabricated buildings)

As published by the council, reference 26/00644/VCON

Application record

Reference
26/00644/VCON
Status
Decided
Decision
Granted As published: Approval of Variation of Condition
Received
4 Jun 2026
Validated
4 Jun 2026
Decided
27 Aug 2026
Ward
Stone Castle
Parish
Stone

Site history

Applications at this address on the Dartford register

This site has had 2 applications since 2025: 2 approved, 0 refused.

  • 25/00920/FUL Granted

    Bluewater Shopping Centre Greenhithe Kent

    Temporary use of part of the existing car park, including the siting of prefabricated buildings and canopy block, to facilitate the storage and collection of electric cars together with parking for courtesy and staff cars (retrospective)

    Decided 11 May 2026 Full applications

Timeline

Dates from the published record

  1. 4 Jun 2026

    Received by Dartford

  2. 26 Jul 2026

    Added to PlanIndex

  3. 27 Aug 2026

    Decision issued: Approval of Variation of Condition

  4. 10 Sep 2026

    Status changed to Decided

    Previously Awaiting decision.

Cases linked to this one on the register

  • 25/00920/FUL Granted

    Bluewater Shopping Centre Greenhithe Kent

    Temporary use of part of the existing car park, including the siting of prefabricated buildings and canopy block, to facilitate the storage and collection of electric cars together with parking for courtesy and staff cars (retrospective)

    Decided 11 May 2026 Full applications

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

  • DELEGATED REPORT SHEET Report · 27 Aug 2026
  • APPROVED Decision Notice · 27 Aug 2026
  • NEWSPAPER NOTICE ACTUAL Additional Information or Correspondence · 18 Jun 2026
  • PL-101 - PROPOSED SITE_REV B Drawings · 04 Jun 2026
  • PL-103 - WELCOME BLOCK_REV B Drawings · 04 Jun 2026
  • PL-104 - WASHBAY CANOPY BLOCK_REV B Drawings · 04 Jun 2026
  • FORM_1_CIL_ADDITIONAL_INFORMATION (1) CIL · 04 Jun 2026
  • COVERING LETTER TO LPA WITH APPLICATION Report · 04 Jun 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Dartford granted permission on 27 August 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Dartford's portal will say. Our guide explains the common types.