Planning application
St Johns Road Garage 125 - 127 London Road Stone Kent
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of a jet car wash
As published by the council, reference 26/00278/FUL
Application record
- Reference
- 26/00278/FUL
- Category
- Full applications
- Status
- Decided
- Decision
- Granted As published: Approval of permission for a temp period
- Received
- 10 Mar 2026
- Validated
- 27 Mar 2026
- Decided
- 9 Sep 2026
- Ward
- Stone House
- Parish
- Stone
Timeline
Dates from the published record
-
10 Mar 2026
Received by Dartford
-
27 Mar 2026
Validated
Checked as complete and ready for consideration.
-
26 Jul 2026
Added to PlanIndex
-
9 Sep 2026
Decision issued: Approval of permission for a temp period
-
10 Sep 2026
Status changed to Decided
Previously Awaiting decision.
Documents
The council's own list, drawings first
18 documents on file for this application
Drawings (8)
- Pl site location plan
- Pl existing ground floor plan
- Pl pre-existing ground floor plan
- Pl existing elevations
- Pl pre-existing elevations
- Pl existing block plan
- Pl pre-existing block plan
- Pl existing drainage network
Everything on file (18)
- THAMES WATER
- KCC ARCHEOLOGY
- LE068_PL_1004 EXISTING DRAINAGE NETWORK
- QA26250/PNIA ENVIRONMENTAL NOISE SURVEY AND PLANT NOISE IMPACT ASSESSMENT REPORT
- NG ASSET PROTECTION
- SGN SAFEDIGS
- UKPN SAFEDIGS
- L068 NOISE REPORT
- PLANNING STATEMENT INC TECH DETAILS
- LE068-PL-1100 EXISTING GROUND FLOOR PLAN
- LE068-PL-1001 EXISTING BLOCK PLAN
- LE068-PL-1200 EXISTING ELEVATIONS
- LE068-PL-0200 PRE-EXISTING ELEVATIONS
- LE068-PL-0100 PRE-EXISTING GROUND FLOOR PLAN
- LE068-PL-0003 PRE-EXISTING BLOCK PLAN
- LE068_PL_0001 SITE LOCATION PLAN
- APPLICATIONFORMREDACTED
- FORM_1_CIL_ADDITIONAL_INFORMATION
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you the drawings on every job in your area. 14 days free.
What this grant of permission means
Dartford granted permission on 9 September 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Dartford
-
26/01323/FUL Awaiting decision
132 East Hill Dartford Kent DA1 1SB
Erection of a single storey side/rear extension and installation of a door to rear elevation
-
26/00837/FUL Granted
35 Clearwater Lane Dartford Kent DA1 1AP
Erection of a part two/part single storey rear extension
-
26/00961/FUL Granted
65A Main Road Longfield Kent DA3 7QT
Provision of a vehicular access onto the B260 and provision of 2 off-street parking spaces with associated hard standing
-
26/00750/FUL Granted
15 Kenwood Avenue Longfield Kent DA3 7EX
Conversion of existing garage to form a habitable room with associated alterations to front elevation, rear extension and alterations to roof to provide two additional dormer windows in rear roof slope and alterations to fenestration
-
26/00840/FUL Granted
2 Firecrest Close Longfield Kent DA3 7NJ
Conversion of existing garage to form new habitable room including raising roof height, alterations to fenestration and relocation of entrance door