Manor Farm North Cray Road Sidcup

Granted Dartford 25/01092/OBB Outside Borough Boundary

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Consultation on application for construction and operation of a 200MW Battery Energy Storage System (BESS) for a temporary period of 40 years, including energy storage containers, transformers, inverters, switchgear, control building, internal access tracks, site access, earthworks, landscaping, and an underground cable connection route (approximately 1.45km in length) to Hurst Grid Substation, and associated infrastructure. within London Borough of Bexley

As published by the council, reference 25/01092/OBB

Application record

Reference
25/01092/OBB
Type
Outside Borough Boundary
Status
Decided
Decision
No Objection
Received
18 Sep 2025
Validated
18 Sep 2025
Decided
15 Oct 2025
Ward
Outside Borough Boundary
Parish
Outside Borough Boundary
Decision by
Delegated Decision

Site history

Applications at this address on the Dartford register

This site has had 2 applications since 2025: 1 approved, 0 refused.

  • 26/00642/OBB Decided

    Manor Farm North Cray Road Sidcup

    Appeal consultation on application for construction and operation of a 200MW Battery Energy Storage System (BESS) for a temporary period of 40 years, including energy storage containers, transformers, inverters, switchgear, control building, internal access tracks, site access, earthworks, landscaping, and an underground cable connection route (approximately 1.45km in length) to Hurst Grid Substation, and associated infrastructure. within London Borough of Bexley

    Submitted 4 Jun 2026

Timeline

Dates from the published record

  1. 18 Sep 2025

    Received by Dartford

  2. 15 Oct 2025

    Decision issued: No Objection

  3. 26 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

2 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Dartford granted permission on 15 October 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Dartford's portal will say. Our guide explains the common types.