Skip to content
PlanIndex Get alerts
Menu

Planning application

26/00651/HPD

100 Brinkburn Road Darlington DL3 6EB

Awaiting decision Darlington Householder Permitted Development

Proposal

Prior Approval for the erection of a single storey rear extension projecting 5.95m from the original dwelling house, 3.90m in height to ridge and 2.80m in height to eaves

As published by the council, reference 26/00651/HPD

Timeline

Dates from the published record

  1. 1 Jul 2026

    Received by Darlington

  2. 13 Jul 2026

    Validated

    Checked as complete and ready for consideration.

  3. 21 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Darlington for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About prior approval applications

How this application type works

Prior approval applications arise where permitted development rights already grant the principle of the work, such as larger home extensions, changes of use to housing or agricultural buildings. The council may only consider the specific matters set out in the rules, for example transport, flooding or appearance, and in many classes the work may proceed if the council does not respond within the deadline, commonly 56 days.

More on prior approval applications in our guide

Nearby applications

Within 500 metres

  • 26/00661/FUL Awaiting decision

    Darlington Railway Athletic Club Brinkburn Road Darlington DL3 9LF

    Siting of an InPost Parcel Locker to the south elevation of the building (Retrospective Application)

    3 Jul 2026 355m away Full applications
  • 26/00592/FUL Awaiting decision

    31 Marwood Crescent Darlington DL3 0JU

    Demolition of existing rear conservatory and erection of a replacement single storey rear extension

    17 Jun 2026 376m away Full applications
  • 26/00095/FUL Awaiting decision

    Pierremont Methodist Church Vancouver Street Darlington DL3 6HN

    Conversion of existing Methodist Church (Use Class F1) to 6 No. flats (3 No. 2 bed and 3 No. 1 bed) (Use Class C3), including erection of part second storey extension, installation of 1.4 m timber boundary fence, cycle storage provision and associated works

    30 Jan 2026 426m away Full applications
  • 26/00681/FUL Awaiting decision

    Car Park Adjacent To 58 West Auckland Road Darlington DL3 9EP

    Siting of an InPost parcel locker within the existing car park (Retrospective Application)

    10 Jul 2026 492m away Full applications
  • 24/00850/CU Granted

    2 Vancouver Street Darlington DL3 6HN

    Change of use from residential dwelling (Use Class C3) to office use (Use Class E)

    29 Aug 2024 496m away Full applications

In Darlington

  • 26/00566/HPD Granted

    2 Lazenby Crescent Darlington DL3 9QB

    Prior Approval for the erection of single storey flat roof extension extending 5.000-metres beyond the rear wall of the original house, with an overall height of 2.600-metres to the top of the flat roof (ridge/eaves) following the demolition of the existing conservatory (amended description).

    9 Jun 2026 Prior approval
  • 26/00655/HPD Awaiting decision

    85 Brankin Drive Darlington DL1 4LH

    Prior Approval for the erection of a single storey rear extension projecting 6.00m from the original dwelling house, 3.25m in height to ridge and 3.00m in height to eaves

    2 Jul 2026 Prior approval
  • 26/00357/PA Granted

    31 Tubwell Row Darlington DL1 1NU

    Prior Approval application for the change of use of first floor from Commercial, Business and Service (Use Class E) to residential use (Use Class C3), comprising the formation of 1 No. three bedroom flat

    8 Apr 2026 Prior approval
  • 26/00418/PA Granted

    T-Mobile Telecommunications Mast (Cell 95917) Albert Hill Industrial Estate Dodsworth Street Darlington

    Prior Approval for the proposed upgrade of an existing base station comprising the removal of a 22.5m monopole and installation of a 25m tower supporting 6no. BTEE/H3G antennas and 3no. dishes together with ancillary development

    24 Apr 2026 Prior approval
  • 26/00585/PA Awaiting decision

    109 Parkgate Darlington DL1 1RZ

    Prior Approval application for the change of use of first floor from Commercial, Business and Service (Use Class E) to residential use (Use Class C3), comprising 1 No. one bedroom flat

    15 Jun 2026 Prior approval