Planning application
11 Claxton Avenue Darlington DL3 9QA
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Prior Approval for the erection of a single storey rear extension projecting 3.5m from the original dwelling house, 3.4m in height to ridge and 2.38m in height to eaves
As published by the council, reference 24/01088/HPD
Application record
- Reference
- 24/01088/HPD
- Type
- Householder Permitted Development
- Status
- Decided
- Decision
- Prior Approval Not Required
- Received
- 8 Nov 2024
- Validated
- 8 Nov 2024
- Decided
- 9 Dec 2024
- Ward
- Mowden
- Parish
- Darlington Urban Area
- Decision by
- Delegated Decision
- Postcode
- DL3 9QA
Timeline
Dates from the published record
-
8 Nov 2024
Received by Darlington
-
9 Dec 2024
Decision issued: Prior Approval Not Required
-
19 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About prior approval applications
How this application type works
Prior approval applications arise where permitted development rights already grant the principle of the work, such as larger home extensions, changes of use to housing or agricultural buildings. The council may only consider the specific matters set out in the rules, for example transport, flooding or appearance, and in many classes the work may proceed if the council does not respond within the deadline, commonly 56 days.
Nearby applications
Within 500 metres
-
2 Lazenby Crescent Darlington DL3 9QB
Prior Approval for the erection of single storey flat roof extension extending 5.000-metres beyond the rear wall of the original house, with an overall height of 2.600-metres to the top of the flat roof (ridge/eaves) following the demolition of the existing conservatory (amended description).
Granted Prior approval Extension Demolition 7 docsSmall domestic -
6 Mowden Hall Drive Darlington DL3 9BJ
95% historically approved · decision due ~24 Sep
Works to a tree protected under Tree Preservation Order 1951 (No.1) - 1 no. Lime (T177) remove epicormic growth from the main stem from ground level up to 4.5m in height and remove deadwood overhanging driveway
Awaiting decision Trees 2 docs -
3 Conyers Close DARLINGTON DL3 9DD
Erection of conservatory to rear elevation
Granted Full applications Extension 8 docs -
Mowden Hall Staindrop Road DARLINGTON
Part approval of details reserved by condition 20 (contamination phase 4) attached to planning permission 18/00989/FUL dated 26 March 2019 (Proposed residential development consisting of 30 residential units)
Granted Conditions New dwelling 3 docs -
12 Hallside DARLINGTON DL3 9FD
Application submitted under Section 73 of the Town and Country Planning Act 1990 for the variation of condition 11 (landscaping scheme) attached to planning permission 18/00898/FUL dated 26 March 2019 (Proposed residential development consisting of 30 residential units) to permit removal of trees within the garden on Plot 6 (12 Hallside) (amended plans received 21 June 2021)
Granted Full applications New dwelling 17 docs -
14 Hallside DARLINGTON DL3 9FD
Application submitted under Section 73 of the Town and Country Planning Act 1990 for the variation of condition 11 (landscaping) attached to planning permission 18/00989/FUL dated 26 March 2019 (Proposed residential development consisting of 30 residential units) to permit felling of 6 no. trees and reduce height by approx 3 mt on 2 no. trees to rear of plot (amended Tree Report received 27 May 2021)
Granted Full applications New dwelling Trees 7 docs
Other prior approval applications
In Darlington
-
26/00715/HPD Granted
14 Burneston Court Darlington DL3 8UL
Prior notification for the erection of a single storey rear extension with flat roof and lantern window, which would extend beyond the rear wall of the original house by 4.050-metres and have a maximum height of 3.200-metres to the ridge and an eaves height of 2.800-metres (amended description).
-
26/00709/HPD Withdrawn
41 Bates Avenue Darlington DL3 0TL
Prior Approval for the erection of a single storey rear extension projecting 3.375M from the original dwelling house, 3.9m in height to ridge and 2.90m in height to eaves
-
26/00835/HPD Awaiting decision
41 Bates Avenue Darlington DL3 0TL
Prior Approval for the erection of a single storey rear extension projecting 3.375m from the original dwelling house, 3.9m in height to ridge and 2.90m in height to eaves
-
26/00585/PA Withdrawn
109 Parkgate Darlington DL1 1RZ
Prior Approval application for the change of use of first floor from Commercial, Business and Service (Use Class E) to residential use (Use Class C3), comprising 1 No. one bedroom flat
-
26/00651/HPD Granted
100 Brinkburn Road Darlington DL3 6EB
Prior Approval for the erection of a single storey rear extension projecting 5.95m from the original dwelling house, 3.90m in height to ridge and 2.80m in height to eaves