Skip to content
PlanIndex Get alerts
Menu

Planning application

74 Beaumont Hill DARLINGTON DL1 3ND

Granted Darlington 21/00785/FUL Full Application

Works: Extension Loft or dormer Demolition Windows or glazing Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of extensions to front elevation with new bays and porch, single storey extension to rear, alterations and extension to roof including box dormer to rear and 2 no. velux windows to front roof slope, demolition of existing garages and erection of replacement detached garage, replacement windows and doors and associated internal alterations

As published by the council, reference 21/00785/FUL

Application record

Reference
21/00785/FUL
Type
Full Application
Status
Decided
Decision
GRANTED WITH CONDITIONS
Received
1 Jul 2021
Validated
1 Jul 2021
Decided
3 Sep 2021
Ward
Heighington And Coniscliffe
Parish
Whessoe Parish Council
Decision by
Delegated Decision
Postcode
DL1 3ND

Timeline

Dates from the published record

  1. 1 Jul 2021

    Received by Darlington

  2. 3 Sep 2021

    Decision issued: GRANTED WITH CONDITIONS

  3. 3 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in Consett

3 applications on PlanIndex · across 2 councils

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

22 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Darlington granted permission on 3 September 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 1 Cranberry Way Darlington DL1 3FL

    26/00732/FUL Submitted 29 Jul 2026 406m away

    96% historically approved · decision due ~23 Sep

    Erection of a porch providing new entrance on the south elevation, replace existing entrance door and canopy with window on the west elevation and replace window with door on the east elevation

    Awaiting decision Full applications Extension Windows or glazing 5 docs
    Small domestic

In Darlington

  • 26/00681/FUL Granted

    Car Park Adjacent To 58 West Auckland Road Darlington DL3 9EP

    Siting of an InPost parcel locker within the existing car park (Retrospective Application)

    10 Jul 2026 Full applications
  • 26/00320/FUL Granted

    4 Glanton Court Darlington DL3 0NY

    Change of use of habitable room to aesthetics clinic (Use Class E)

    30 Mar 2026 Full applications
  • 26/00634/FUL Granted

    8 Swinbridge Darlington DL2 2GB

    Erection of single storey rear extension with sloping canopy extending over the proposed extension and the previously approved rear extension

    26 Jun 2026 Full applications
  • 26/00592/FUL Granted

    31 Marwood Crescent Darlington DL3 0JU

    Demolition of existing rear conservatory and erection of a replacement single storey rear extension

    17 Jun 2026 Full applications
  • 26/00704/FUL Granted

    George Dent Nursery School Elms Road Darlington DL3 7PY

    Installation of 1 No. external air conditioning compressor unit to west elevation to include 1 No. air conditioning unit to internal room

    20 Jul 2026 Full applications