Planning application
NatWest 5 - 9 Bank Court Hemel Hempstead Hertfordshire HP1 1BS
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Removal of ATM's, Night Safe Components, existing signage and reinstate materials where required
As published by the council, reference 26/00489/FUL
Application record
- Reference
- 26/00489/FUL
- Type
- Full Planning Permission
- Status
- Granted
- Decision
- Grant Permission/Consent
- Received
- 2 Mar 2026
- Validated
- 4 Mar 2026
- Decided
- 24 Apr 2026
- Ward
- Hemel Hempstead Town
- Parish
- Hemel Hempstead (No Parish)
- Decision by
- Delegated Decision
- Postcode
- HP1 1BS
Timeline
Dates from the published record
-
2 Mar 2026
Received by Dacorum
-
4 Mar 2026
Validated
Checked as complete and ready for consideration.
-
24 Apr 2026
Decision issued: Grant Permission/Consent
-
9 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file
52 applications on PlanIndex · across 37 councils · 100% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
11 Bank Court Hemel Hempstead Hertfordshire HP1 1BX
Installation of 1no new louvre in the front elevation first floor area, 2no new air conditioning condenser units and 2no new heat recovery units on the roof, 3no new cat ladders on roof for condenser units and heat recovery units maintenance access, 7no new external lighting for plant maintenance access, edge protection rails on roof and replacement of existing door to new on roof level.
Granted Full applications 16 docs -
11 Bank Court Hemel Hempstead Hertfordshire HP1 1BX
Details as required by condition 3 (noise impact assessment) attached to planning permission 21/02068/FUL (Installation of 1no new louvre in the front elevation first floor area, 2no new air conditioning condenser units and 2no new heat recovery units on the roof, 3no new cat ladders on roof for condenser units and heat recovery units maintenance access, 7no new external lighting for plant maintenance access, edge protection rails on roof and replacement of existing door to new on roof level).
Granted Conditions 5 docs -
11 Bank Court Hemel Hempstead Hertfordshire HP1 1BX
Non-Material amendment attached to planning permission 21/02068/FUL (Installation of 1no new louvre in the front elevation first floor area, 2no new air conditioning condenser units and 2no new heat recovery units on the roof, 3no new cat ladders on roof for condenser units and heat recovery units maintenance access, 7no new external lighting for plant maintenance access, edge protection rails on roof and replacement of existing door to new on roof level. )
Granted Amendments 6 docs -
TUI 232 -234 Marlowes Hemel Hempstead Hertfordshire HP1 1BJ
77% historically approved · decision due ~25 Mar
Change of use of first and second floor offices (Use Class E) to residential (Use Class C3) to create four 1x bed flats with associated works
Awaiting decision Full applications New dwelling 21 docs -
226 - 254 Marlowes Hemel Hempstead Hertfordshire
86% historically approved · decision due ~25 May
Details required by Conditions 1 (materials) and 2 (CMP) attached to planning permission 23/00334/DPA
Awaiting decision Conditions 8 docs -
Footpath Outside Physique Gym 226-228 Marlowes Hemel Hempstead Hertfordshire HP1 1BJ
Display advertisements on two freestanding illuminated digital LCD screens to both sides of freestanding 'Street Hub' equipment
Granted Advertising 13 docs
Other full applications applications
In Dacorum
-
26/01082/FUL Granted
Headlands House Headlands Drive Berkhamsted Hertfordshire HP4 2PG
Replacement dwelling of Headlands House with part 1, part 2 storey structure with lower ground floor, landscaping and adaption of elevations of existing garage outbuilding
-
26/01881/FUL Awaiting decision
Bowling Club Hempstead Lane Potten End Hertfordshire HP4 2QJ
Construction of equipment shed
-
26/01871/FUL Awaiting decision
Long Marston Cricket Club Cheddington Lane Long Marston Hertfordshire HP23 4QP
Single storey front, side and rear extension to existing cricket club pavilion. Demolition of existing machinery store and construction of new machinery store.
-
26/01878/FUL Awaiting decision
Pouchen End Farm House Pouchen End Lane Hemel Hempstead Hertfordshire HP1 2SA
Construction of one detached five-bedroom dwelling with associated access, parking, cycle and refuse storage, landscaping and associated works.
-
26/01862/FUL Awaiting decision
Land South Of Barnes Lane Kings Langley Hertfordshire
Construction of three family dwellings together with associated landscaping, private amenity space, parking and access arrangements.