Planning application
26/00017/FUL
Ferrers Hill Farm Pipers Lane Markyate St Albans Hertfordshire
Proposal
Change of use from equestrian to residential; demolition of existing stables, removal of manege and construction of 1no. dwelling house within landscaped grounds and the creation of new dedicated access.
As published by the council, reference 26/00017/FUL
Timeline
Dates from the published record
-
7 Jan 2026
Received by Dacorum
-
21 May 2026
Validated
Checked as complete and ready for consideration.
-
23 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Dacorum for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
21/02195/FUL Granted
Drummonds Fold Millfield Lane Markyate St Albans Hertfordshire AL3 8QQ
Conversion of existing garage (incidental residential) into a separate residential dwelling (use class C3).
-
24/01727/FUL Refused
Willow Tree Farm Pipers Lane Markyate St Albans Hertfordshire AL3 8QG
Replacement stable block
-
26/01337/FHA Awaiting decision
Beechurst Caddington Common Markyate St Albans Hertfordshire AL3 8QF
Construction of a basement
Other full applications applications
In Dacorum
-
26/01651/FUL Awaiting decision
Hemel Hempstead School Heath Lane Hemel Hempstead Hertfordshire HP1 1TX
Two-storey extension to the existing Sixth Form and Teaching Block, along with associated plant infrastructure and external works.
-
26/01087/FUL Granted
3A Blossom Way Hemel Hempstead Hertfordshire HP2 4ZB
Installation of eight condenser units and associated cable tray in connection with the adjacent Data Centre
-
26/01643/FUL Awaiting decision
Hemel Hempstead School Heath Lane Hemel Hempstead Hertfordshire HP1 1TX
Installation of external walkway lighting, with associated electrical infrastructure.
-
26/00745/FUL Granted
62 Oak Street Hemel Hempstead Hertfordshire HP3 9TT
Single-storey rear extension and creation of two off-street parking spaces at front of house with crossover and dropped kerb.
-
26/01199/FUL Refused
44 High Street Bovingdon Hemel Hempstead Hertfordshire HP3 0HJ
Proposed demolition of existing buildings and construction of shop and 4x residential units