Planning application
End Oak Water Lane Bovingdon Hemel Hempstead Hertfordshire HP3 0NA
Works: New dwelling Demolition Domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Demolition of existing storage buildings and redevelopment with a self-build dwelling and ancillary garage store/workshop
As published by the council, reference 25/02739/FUL
Application record
- Reference
- 25/02739/FUL
- Type
- Full Planning Permission
- Status
- Granted
- Decision
- Grant Permission/Consent
- Received
- 5 Nov 2025
- Validated
- 5 Nov 2025
- Decided
- 28 Apr 2026
- Ward
- Bovingdon / Flaunden / Chipperfield
- Parish
- Bovingdon Parish Council
- Decision by
- Delegated Decision
- Postcode
- HP3 0NA
Timeline
Dates from the published record
-
5 Nov 2025
Received by Dacorum
-
28 Apr 2026
Decision issued: Grant Permission/Consent
-
9 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Shenley
39 applications on PlanIndex · across 4 councils · 90% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
15 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
End Oak Water Lane Bovingdon Hemel Hempstead Hertfordshire HP3 0NA
86% historically approved · decision due ~30 Sep
Details as required by Condition 2 (Materials), 3 (Hard and soft landscaping) ,4 (Contamination 1),7 (Tree Protection) attached to planning permission to 25/02739/FUL
Awaiting decision Conditions Trees 13 docs -
End Oak Water Lane Bovingdon Hemel Hempstead Hertfordshire HP3 0NA
Details as required by Conditions 2 (Materials),3 (Landscaping),4 (Contamination 1), and 7 (Tree Protection) attached to planning permission 25/02739/FUL
Refused Conditions Trees 12 docs -
Oakleigh Water Lane Bovingdon Hemel Hempstead Hertfordshire HP3 0NA
New porch and side extension and outbuilding to the rear.
Granted Lawful development Extension 14 docsSmall domestic -
Oakleigh Water Lane Bovingdon Hemel Hempstead Hertfordshire HP3 0NA
Additional storey over the principal part of the house.
Granted Prior approval 12 docs -
Oakleigh Water Lane Bovingdon Hemel Hempstead Hertfordshire HP3 0NA
Single storey rear extension measuring 8.00m deep with a maximum ridge height of 3.00m and a maximum eaves height of 2.70m
Granted Prior approval Extension Roofing 12 docsSmall domestic -
End Oak Water Lane Bovingdon Hemel Hempstead Hertfordshire HP3 0NA
Additional storey over the principal part of the house.
Granted Prior approval 10 docs
Other full applications applications
In Dacorum
-
26/01082/FUL Granted
Headlands House Headlands Drive Berkhamsted Hertfordshire HP4 2PG
Replacement dwelling of Headlands House with part 1, part 2 storey structure with lower ground floor, landscaping and adaption of elevations of existing garage outbuilding
-
26/01881/FUL Awaiting decision
Bowling Club Hempstead Lane Potten End Hertfordshire HP4 2QJ
Construction of equipment shed
-
26/01871/FUL Awaiting decision
Long Marston Cricket Club Cheddington Lane Long Marston Hertfordshire HP23 4QP
Single storey front, side and rear extension to existing cricket club pavilion. Demolition of existing machinery store and construction of new machinery store.
-
26/01878/FUL Awaiting decision
Pouchen End Farm House Pouchen End Lane Hemel Hempstead Hertfordshire HP1 2SA
Construction of one detached five-bedroom dwelling with associated access, parking, cycle and refuse storage, landscaping and associated works.
-
26/01862/FUL Awaiting decision
Land South Of Barnes Lane Kings Langley Hertfordshire
Construction of three family dwellings together with associated landscaping, private amenity space, parking and access arrangements.