Planning application
25/01590/FUL
Kings Road Church Kings Road Berkhamsted Hertfordshire HP4 3BD
Proposal
Demolition of existing building and replacement with new church and community facilities.
As published by the council, reference 25/01590/FUL
Timeline
Dates from the published record
-
26 Jun 2025
Received by Dacorum
-
23 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Dacorum for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
24/02160/FHA Granted
5 Elm Grove Berkhamsted Hertfordshire HP4 1AE
Demolish freestanding garage, replace the roof material to slate.
-
24/02312/TCA Granted
14 Kings Road Berkhamsted Hertfordshire HP4 3BD
Works to tree
-
22/02933/FUL Granted
Kings Road Garage 1 Kings Road Berkhamsted Hertfordshire HP4 3BD
Retention of change of use from car sales/workshop to bike sales/workshop.
-
23/00342/LDE Granted
LLOYDS BANK 203 - 205 High Street Berkhamsted Hertfordshire HP4 1AP
Use of the entire building and land as bank within Class E.
-
23/00540/TCA Granted
3 Torrington Road Berkhamsted Hertfordshire HP4 3DD
Works to tree
-
21/02604/FHA Granted
13 Clarence Road Berkhamsted Hertfordshire HP4 3BQ
Loft conversion incorporating a rear dormer window and rooflight
Other full applications applications
In Dacorum
-
26/01651/FUL Awaiting decision
Hemel Hempstead School Heath Lane Hemel Hempstead Hertfordshire HP1 1TX
Two-storey extension to the existing Sixth Form and Teaching Block, along with associated plant infrastructure and external works.
-
26/01087/FUL Granted
3A Blossom Way Hemel Hempstead Hertfordshire HP2 4ZB
Installation of eight condenser units and associated cable tray in connection with the adjacent Data Centre
-
26/01643/FUL Awaiting decision
Hemel Hempstead School Heath Lane Hemel Hempstead Hertfordshire HP1 1TX
Installation of external walkway lighting, with associated electrical infrastructure.
-
26/00745/FUL Granted
62 Oak Street Hemel Hempstead Hertfordshire HP3 9TT
Single-storey rear extension and creation of two off-street parking spaces at front of house with crossover and dropped kerb.
-
26/01199/FUL Refused
44 High Street Bovingdon Hemel Hempstead Hertfordshire HP3 0HJ
Proposed demolition of existing buildings and construction of shop and 4x residential units