Planning application
Belmont Road Baptist Church Belmont Road Hemel Hempstead Hertfordshire HP3 9FZ
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Proposed new single storey front/side extensions and external/internal alterations
As published by the council, reference 24/01431/FUL
Application record
- Reference
- 24/01431/FUL
- Type
- Full Planning Permission
- Status
- Granted
- Decision
- Grant Permission/Consent
- Received
- 25 Jun 2024
- Validated
- 1 Jul 2024
- Decided
- 2 Oct 2024
- Ward
- Bennetts End
- Parish
- Hemel Hempstead (No Parish)
- Decision by
- Delegated Decision
- Postcode
- HP3 9FZ
Timeline
Dates from the published record
-
25 Jun 2024
Received by Dacorum
-
1 Jul 2024
Validated
Checked as complete and ready for consideration.
-
2 Oct 2024
Decision issued: Grant Permission/Consent
-
9 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a design practice registered in Harrow
13 applications on PlanIndex · across 3 councils · 92% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
95 Belmont Road Hemel Hempstead Hertfordshire HP3 9NX
77% historically approved · decision due ~4 May
Subdivision of existing dwelling to form a separate 1 bedroom house. Rear extension and dropped kerb
Awaiting decision Full applications Extension 15 docsSmall domestic -
47 Risedale Road Hemel Hempstead Hertfordshire HP3 9NW
SIngle storey rear extension
Granted Lawful development Extension 5 docsSmall domestic -
4 Sunrise Crescent Hemel Hempstead Hertfordshire HP3 9NR
Single storey rear extension
Granted Householder Extension 6 docsSmall domestic -
107 Hobbs Hill Road Hemel Hempstead Hertfordshire HP3 9QG
Single storey rear extension replacing conservatory
Granted Householder Extension 7 docsSmall domestic -
123-125 Hobbs Hill Road Hemel Hempstead Hertfordshire HP3 9QG
Front elevation glass panel to be replaced and changed door position. Internal wall removed for bigger opening.
Granted Full applications 5 docs -
107 Belmont Road Hemel Hempstead Hertfordshire HP3 9NX
Proposed alteration to the rear elevation inserting three extra rooflights to the rear single storey extension.(Amended scheme 21/00400/FHA )
Granted Householder Extension Loft or dormer 10 docsSmall domestic
Other full applications applications
In Dacorum
-
26/01082/FUL Granted
Headlands House Headlands Drive Berkhamsted Hertfordshire HP4 2PG
Replacement dwelling of Headlands House with part 1, part 2 storey structure with lower ground floor, landscaping and adaption of elevations of existing garage outbuilding
-
26/01881/FUL Awaiting decision
Bowling Club Hempstead Lane Potten End Hertfordshire HP4 2QJ
Construction of equipment shed
-
26/01871/FUL Awaiting decision
Long Marston Cricket Club Cheddington Lane Long Marston Hertfordshire HP23 4QP
Single storey front, side and rear extension to existing cricket club pavilion. Demolition of existing machinery store and construction of new machinery store.
-
26/01878/FUL Awaiting decision
Pouchen End Farm House Pouchen End Lane Hemel Hempstead Hertfordshire HP1 2SA
Construction of one detached five-bedroom dwelling with associated access, parking, cycle and refuse storage, landscaping and associated works.
-
26/01862/FUL Awaiting decision
Land South Of Barnes Lane Kings Langley Hertfordshire
Construction of three family dwellings together with associated landscaping, private amenity space, parking and access arrangements.