Skip to content
PlanIndex Get alerts
Menu

Planning application

Sealy Uk, Station Road, Aspatria, CA7 2AS

Granted Cumberland FUL/2021/0229 Full planning permission

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Formation of single storey extension to house manufacturing equipment for the bed making process carried out on the site

As published by the council, reference FUL/2021/0229

Application record

Reference
FUL/2021/0229
Type
Full planning permission
Status
Determined
Decision
Permitted
Received
17 Aug 2021
Validated
17 Aug 2021
Decided
19 Oct 2021
Ward
Aspatria Ward
Parish
Aspatria CP
Decision by
Delegated Decision
Postcode
CA7 2AS

Timeline

Dates from the published record

  1. 17 Aug 2021

    Received by Cumberland

  2. 19 Oct 2021

    Decision issued: Permitted

  3. 27 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Aspatria Creamery, Station Road, Aspatria, CA7 2AR

    CLDP/2021/0003 Submitted 16 Jun 2021 135m away

    Certificate of Lawful Development for the erection of a new "top hat" roof projection from existing building to accommodate new production equipment

    Granted Lawful development 6 docs
  • Aspatria Creamery, Station Road, Aspatria CA7 2AR

    FUL/2025/0188 Submitted 4 Dec 2025 135m away

    Demolition of existing building and construction of new single storey vat room, within existing creamery. Including erection of new loading canopy to front of new vat room and relocation of existing weighbridge.

    Granted Full applications Demolition 25 docs
    Small domestic
  • Aspatria Creamery, Station Road, Aspatria, Wigton, CA7 2AR

    CON/2026/0044 Submitted 27 Aug 2026 135m away

    100% historically approved · decision due ~22 Oct

    Discharge of condition 3 (desk top study for contamination), condition 4 (contamination mitigation scheme) and condition 7 (construction and demolition method statement) on approved application FUL/2025/0188

    Awaiting decision Conditions Demolition 6 docs
  • Aspatria Rugby Union Football Club, Station Road, Aspatria, Wigton CA7 2AJ

    FUL/2024/0201 Submitted 30 Sep 2024 285m away

    Removal of existing shipping and storage container at the rear side of the rugby grandstand and replace with a new fitness pod

    Granted Full applications 11 docs
  • 3, Arkleby Road, Aspatria, CA7 2BA

    HOU/2025/0158 Submitted 14 Oct 2025 339m away

    The installation of a permeable block paved driveway with dropped kerb

    Withdrawn Householder 14 docs
    Small domestic
  • 51 Arkleby Road, Aspatria, Wigton, CA7 2BA

    REG5/2026/0054 Submitted 21 Jan 2026 339m away

    98% historically approved · decision due ~18 Mar

    Proposed telecommunications installation: 1 x 9 metre medium telecommunications poles

    Decided

In Cumberland

  • FUL/2026/0120 Awaiting decision

    14, High Street, Wigton, CA7 9NJ

    Change of Use from former bank to two class E shops and three flats

    2 Sep 2026 Full applications
  • 26/0484 Granted

    39 Scotch Street, Carlisle, CA3 8PT

    Internal Refit Of Existing Shop

    27 Aug 2026 Full applications
  • FUL/2026/0106 Awaiting decision

    Unit 4, Derwent Mills Commercial Park, Cockermouth, CA13 0HT

    Refurbishment of existing commercial office with warehouse, removing manually operated window and door shutters on the ground floor with new electrically operated versions.

    28 Aug 2026 Full applications
  • 26/0483 Awaiting decision

    Land adjacent to Westwood, Carlisle

    Erection Of Care Home For 2no. Children With Associated Drainage & External Works

    27 Aug 2026 Full applications
  • 26/0346 Granted

    Unit P6, Kingmoor Park Road, Kingmoor Park Central, Carlisle, CA6 4SD

    Change Of Use From Use Class B2/B8 (General Industrial/Storage And Distribution) To Use Class E(d) (Indoor Sport, Recreation And Fitness) To Provide An Indoor Sports Facility

    23 Jun 2026 Full applications