Planning application

RED LION HOTEL, 2 MARKET PLACE, EGREMONT

Granted Cumberland 4/26/2044/0F1

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

REFURBISHMENT AND EXTENSION OF EXISTING TWO STOREY BUILDING FOR COMMUNITY USE; CREATION OF NEW PUBLIC REALM; CONSTRUCTION OF TWO NEW SINGLE STOREY BUILDINGS FOR COMMERCIAL AND COMMUNITY USES; AND FORMALISTION OF ADDITIONAL PARKING SPACES TO SERVE THE PROPOSED COMMUNITY BUILDING

As published by the council, reference 4/26/2044/0F1

Application record

Reference
4/26/2044/0F1
Status
Permitted
Decision
APPROVE
Received
6 Feb 2026
Validated
6 Feb 2026
Decided
8 May 2026
Parish
Egremont

Timeline

Dates from the published record

  1. 6 Feb 2026

    Received by Cumberland

  2. 8 May 2026

    Decision issued: APPROVE

  3. 14 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

66 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About this record

Reading the register

This page mirrors an entry on the statutory planning register that Cumberland is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.

Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.

Nearby applications

Within 500 metres

  • LAND ADJACENT TO 11 LAMB LANE, EGREMONT

    4/24/2363/TPO Submitted 23 Oct 2024 51m away

    REMOVAL OF A FIRE DAMAGED TREE WITHIN A CONSERVATION AREA

    Granted Trees 5 docs
  • 63 MAIN STREET, EGREMONT

    4/26/2002/TPO Submitted 2 Jan 2026 144m away

    REMOVAL OF TREES SITUATED WITHIN A CONSERVATION AREA

    Granted Trees 6 docs
  • ST BRIDGETS R C SCHOOL, ST BRIDGETS LANE, EGREMONT

    4/26/2093/DOC Submitted 23 Mar 2026 248m away

    DISCHARGE OF CONDITION 6 AND THE REQUIREMENTS OF BIODIVERSITY NET GAIN OF PLANNING APPROVAL 4/24/2425/0F1

    Granted Conditions 7 docs
  • 18 TOWER VIEW, EGREMONT

    4/25/2316/0F1 Submitted 17 Sep 2025 308m away

    PROPOSED TWO STOREY REAR EXTENSION

    Granted Extension 16 docs
  • 80 MAIN STREET, EGREMONT

    4/26/2066/0F1 Submitted 24 Feb 2026 326m away

    PROPOSED CHANGE OF USE FROM C3 DWELLING HOUSE TO 2 APARTMENTS

    Granted Amendments New dwelling 19 docs
    Several homes
  • 1 GREENDYKES, EGREMONT

    4/26/2011/0F1 Submitted 15 Jan 2026 362m away

    DEMOLITION OF PARTIAL REAR EXTENSION AND ERECTION OF REPLACEMENT SINGLE STOREY EXTENSION WITH FLAT ROOF

    Granted Other Extension Demolition 8 docs
    Small domestic