Planning application
5 ELLERBECK BARNS, EGREMONT
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
USE OF LAND FOR THE SITING OF FOUR GLAMPING PODS WITH SMALL DECKING AREAS, CONSTRUCTION OF A PARKING COMPRISING 4 SPACES, FOOTWAYS AND ASSOCIATED DRAINAGE AND MINOR EARTH WORKS TO REGRADE THE LAND LEVELS
As published by the council, reference 4/22/2042/0F1
Application record
- Reference
- 4/22/2042/0F1
- Status
- Permitted
- Decision
- APPROVE
- Received
- 28 Jan 2022
- Validated
- 28 Jan 2022
- Decided
- 20 Apr 2023
- Parish
- Egremont
Timeline
Dates from the published record
-
28 Jan 2022
Received by Cumberland
-
20 Apr 2023
Decision issued: APPROVE
-
28 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
54 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About this record
Reading the register
This page mirrors an entry on the statutory planning register that Cumberland is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.
Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.
Nearby applications
Within 500 metres
-
5 ELLERBECK BARNS, EGREMONT
LAWFUL DEVELOPMENT CERTIFICATE TO CONFIRM THAT A MATERIAL COMMENCEMENT HAS BEEN MADE TO PLANNING PERMISSION 4/25/2124/0B1 - APPLICATION UNDER SECTION 73 TO VARY CONDITIONS 2, 3, 5, 6, 7 & 10 TO REFLECT UPDATED DRAINAGE & HIGHWAY INFORMATION OF PLANNING APPLICATION 4/22/2042/0F1 - USE OF LAND FOR SITING OF FOUR GLAMPING PODS WITH SMALL DECKING AREA, CONSTRUCTION OF PARKING COMPRISING 4 SPACES, FOOTWAYS & ASSOCIATED DRAINAGE & MINOR EARTHWORKS TO REGRADE THE LAND LEVELS
Granted Conditions 9 docs -
GHYLL FARM, EGREMONT
INSULATION OF EXTERNAL EXPOSED WALLS; REPOINT STONEWORK WITH TRADITIONAL LIME METHOD IN PLACE OF CEMENT RENDER AND DASH. INTERNAL WALLS (CURRENT PLASTER SAND AND CEMENT) TO BE INSULATED PLASTERBOARD & VENTED. IN ROOF, SOLAR PV SYSTEM REAR OF PROPERTY, REPLACE DOOR AND WINDOWS; ECOSLIDE SLIDING SASH SINGLE VERTICAL ASTRAGAL GLAZING BAR RUN THROUGH SASH HORNS
Withdrawn Windows or glazing 15 docs