Skip to content
PlanIndex Get alerts
Menu

Planning application

5 ELLERBECK BARNS, EGREMONT

Granted Cumberland 4/22/2042/0F1

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

USE OF LAND FOR THE SITING OF FOUR GLAMPING PODS WITH SMALL DECKING AREAS, CONSTRUCTION OF A PARKING COMPRISING 4 SPACES, FOOTWAYS AND ASSOCIATED DRAINAGE AND MINOR EARTH WORKS TO REGRADE THE LAND LEVELS

As published by the council, reference 4/22/2042/0F1

Application record

Reference
4/22/2042/0F1
Status
Permitted
Decision
APPROVE
Received
28 Jan 2022
Validated
28 Jan 2022
Decided
20 Apr 2023
Parish
Egremont

Timeline

Dates from the published record

  1. 28 Jan 2022

    Received by Cumberland

  2. 20 Apr 2023

    Decision issued: APPROVE

  3. 28 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

54 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About this record

Reading the register

This page mirrors an entry on the statutory planning register that Cumberland is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.

Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.

Nearby applications

Within 500 metres

  • 5 ELLERBECK BARNS, EGREMONT

    4/26/2122/0E1 Submitted 21 Apr 2026 0m away

    LAWFUL DEVELOPMENT CERTIFICATE TO CONFIRM THAT A MATERIAL COMMENCEMENT HAS BEEN MADE TO PLANNING PERMISSION 4/25/2124/0B1 - APPLICATION UNDER SECTION 73 TO VARY CONDITIONS 2, 3, 5, 6, 7 & 10 TO REFLECT UPDATED DRAINAGE & HIGHWAY INFORMATION OF PLANNING APPLICATION 4/22/2042/0F1 - USE OF LAND FOR SITING OF FOUR GLAMPING PODS WITH SMALL DECKING AREA, CONSTRUCTION OF PARKING COMPRISING 4 SPACES, FOOTWAYS & ASSOCIATED DRAINAGE & MINOR EARTHWORKS TO REGRADE THE LAND LEVELS

    Granted Conditions 9 docs
  • GHYLL FARM, EGREMONT

    4/20/2438/0L1 Submitted 26 Oct 2020 128m away

    INSULATION OF EXTERNAL EXPOSED WALLS; REPOINT STONEWORK WITH TRADITIONAL LIME METHOD IN PLACE OF CEMENT RENDER AND DASH. INTERNAL WALLS (CURRENT PLASTER SAND AND CEMENT) TO BE INSULATED PLASTERBOARD & VENTED. IN ROOF, SOLAR PV SYSTEM REAR OF PROPERTY, REPLACE DOOR AND WINDOWS; ECOSLIDE SLIDING SASH SINGLE VERTICAL ASTRAGAL GLAZING BAR RUN THROUGH SASH HORNS

    Withdrawn Windows or glazing 15 docs