Planning application
The Byre, Fenton, How Mill, Brampton, CA8 9JZ
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Installation Of Split Unit Air Conditioning System (LBC)
As published by the council, reference 26/0369
Application record
- Reference
- 26/0369
- Type
- Listed Building Consent
- Status
- Registered
- Received
- 1 Jul 2026
- Validated
- 10 Jul 2026
- Ward
- Corby & Hayton
- Parish
- Hayton
- Postcode
- CA8 9JZ
Timeline
Dates from the published record
-
1 Jul 2026
Received by Cumberland
-
10 Jul 2026
Validated
Checked as complete and ready for consideration.
-
14 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 4 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Cumberland took a median of 56 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
11 documents on file for this application
- 0002 heritage officer 02092026
- 0002 urban design / conservation officer response 20082026
- Amended design and access and heritage statement 20082026
- Site notice
- Superseded 20082026 design access & heritage statement 10072026
- 01 elevations 10072026
- 02 floor plans 10072026
- Application form 01072026
- 03 location plan 01072026
- Plan 01072026
- Ac plan 01072026
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Cumberland for determination, against a statutory target of eight weeks. Over the last year Cumberland decided heritage and listed building applications in a median of 76 days. More in our guide to how long planning decisions take.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Jonathans Farmhouse & The Byre, Fenton, How Mill, Brampton, CA8 9JZ
98% historically approved · decision due ~4 Nov
Replacement Of Potting Shed/Greenhouse With Solid Timber Garden Room With Covered Area For Seating; Rebuilding Of Compost/Garden Waste Enclosure Within The Garden Of The Byre & Erection Of Aluminium Garden Shed (Retrospective)
Awaiting decision Householder 15 docsSmall domestic -
Jonathans Farmhouse & The Byre, Fenton, How Mill, Brampton, CA8 9JZ
100% historically approved · decision due ~4 Nov
Retention Of Relocated Timber Field Gate To Main Driveway; Replacement Pedestrian Gate To Jonathans Farmhouse (LBC)
Awaiting decision Heritage and listed buildings 12 docs -
Chapel Cottage, Fenton, How Mill, Brampton, CA8 9JZ
First Floor Extension To Provide 1No. Bedroom
Granted Householder Extension 5 docsDomestic -
Land Adjacent To Former Chapel, Fenton, How Mill, Carlisle
Erection Of Detatched Dwelling (Revised Application).
Granted Full applications 15 docsDomestic -
Land Adjacent To Former Chapel, Fenton, How Mill, Carlisle CA8 9JZ
Renewal of Unexpired Permission Of Previously Approved Application 08/0008 For Erection Of Detatched Dwelling
Granted Amendments 7 docsDomestic -
L/A Willowdale, Fenton, Carlisle
Erection Of 2No. Detached Dwellings (Outline)
Granted Outline 16 docs
Other heritage and listed building applications
In Cumberland
-
4/26/2302/0L1 Status unknown
44 IRISH STREET, WHITEHAVEN
LISTED BUILDING CONSENT FOR INSTALLATION OF NEW FIBRE OPTIC ETHERNET CONNECTION IN FIRST FLOOR SERVER ROOM
-
4/26/2303/0L1 Status unknown
4 MARINE TERRACE, OAKBANK, WHITEHAVEN
LISTED BUILDING CONSENT FOR STRIPPING SLATE ROOF, REPAIR OF RAFTERS AND INSTALLATION OF MEMBRANE AND REPLACEMENT SLATES TO ROOF OF MAIN DWELLING AND ALSO REAR EXTENSION (RETROSPECTIVE)
-
LBC/2026/0038 Awaiting decision
4, Strawberry How, Cockermouth, CA13 9XZ
Listed Building consent for a square louvre vent installation for a ground floor W.C.
-
26/0256 Granted
Green Lane House, Greenhill, Brampton, CA8 1SU
Installation Of Fibre Telecom Cable & DCSB Unit & Comms Cabinet (LBC)
-
4/26/2298/0L1 Status unknown
3 OAKBANK, WHITEHAVEN
LISTED BUILDING CONSENT TO INSTALL A REVERSIBLE AIR-TO-AIR HEAT PUMP SYSTEM