Planning application

Harker Substation, Harker Road Ends, Low Harker, Carlisle, Cumbria, CA6 4DQ

Granted Cumberland 12/0057 Full Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation Of Two Mechanically Switched Capacitor Units (MSC) Along With Associated Security Fencing And Landscaping

As published by the council, reference 12/0057

Application record

Reference
12/0057
Type
Full Planning Permission
Status
Decided
Decision
Grant Permission
Received
27 Jan 2012
Validated
15 Feb 2012
Decided
29 Mar 2012
Ward
Longtown & Rockcliffe (Abolished 2019
Parish
Rockcliffe
Decision by
Delegated
Postcode
CA6 4DQ

Timeline

Dates from the published record

  1. 27 Jan 2012

    Received by Cumberland

  2. 15 Feb 2012

    Validated

    Checked as complete and ready for consideration.

  3. 29 Mar 2012

    Decision issued: Grant Permission

  4. 18 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Harker Substation, Harker Road Ends, Low Harker, Carlisle, Cumbria, CA6 4DQ

    14/0133 Submitted 20 Feb 2014 0m away

    Non Material Amendment (Alterations To Landscaping Scheme) Of Previously Approved Planning Permission 12/0057

    Decided Amendments
  • Harker Grid Sub Station, Harker, Carlisle, CA6 4DQ

    12/0958 Submitted 19 Nov 2012 0m away

    Non Material Amendment (Alterations To Construction Access) Of Previously Approved Permission 12/0057

    Decided Amendments 1 doc
  • Land to the East of Harker Substation, Rockcliffe, Carlisle, CA6 4DQ

    26/0003/HDG Submitted 24 Feb 2026 261m away

    Removal Of Section Of Hedgerow For Installation Of Cabling

    Granted Trees 9 docs
  • Land North of Harker Grid Sub Station, Harker, Carlisle

    26/0354 Submitted 25 Jun 2026 261m away

    Non Material Amendment Of Previously Approved Permission 22/0981 (Proposed Extension To Harker Substation As Part Of The Harker Energy Enablement Project Comprising Substation Buildings, Supergrid Transformers, Busbars & Switchgear, Diesel Generator, Mechanically Switched Capacitor, Associated Landscaping And Biodiversity Enhancement, Drainage, Internal Access Roads And Parking, Lighting & CCTV, Fencing & New Site Access)

    Decided Amendments Extension 12 docs
  • Harker Grid Sub Station, Harker, Carlisle

    25/0003/ESO Submitted 15 Sep 2025 261m away

    94% historically approved · decision due ~10 Nov

    Request For An EIA Screening Opinion For Enabling And Construction Activities Associated With The Installation Of 7no. New Cable Sealing End Platforms (CSEPs) On 4no. Existing 132kv Overhead Line Towers. The Works Are Required To Facilitate The Connection Of Overhead Lines Into The New Substation Infrastructure At Harker

    Awaiting decision Outline
  • Land to the north of Harker National Grid Substation, Harker, Carlisle, CA6 4DQ

    25/0716 Submitted 24 Dec 2025 382m away

    Installation Of An Underground Electricity Cable & Associated Infrastructure To Connect The Previously Approved Battery Energy Storage System (BESS) Application Reference 23/0833 To Harker National Grid Substation

    Granted Full applications 21 docs

In Cumberland

  • FUL/2026/0088 Granted

    Moorhouse Farm, Wigton, CA7 0NT

    Replacement General Purpose Agricultural Shed

    13 Jul 2026 Full applications
  • FUL/2026/0094 Awaiting decision

    Albion Hotel, Eden Street, Silloth CA7 4AS

    Demolition of store and outbuildings and proposed extension to public house and new external staircase to provide access to manager accommodation

    3 Sep 2026 Full applications
  • 26/0428 Granted

    Unit 2, St Nicholas Gate Retail Park, London Road, Carlisle, CA1 2EA

    Pop-Up Roof Extension To Accommodate New Internal Lift

    30 Jul 2026 Full applications
  • FUL/2026/0120 Awaiting decision

    14, High Street, Wigton, CA7 9NJ

    Change of Use from former bank to two class E shops and three flats

    2 Sep 2026 Full applications
  • FUL/2026/0119 Awaiting decision

    Workington Hall, Curwen Park, Workington, CA14 3AN

    The installation of new ground-mounted up light (floodlighting) units to illuminate the external walls of the hall

    2 Sep 2026 Full applications